Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

High-Capacity, Mobile Stormwater Pumps Project
Infrastructure
Bidding
Southwest Ranches, FL 33331

Design and Permitting of Class I Deep Injection Well at Prineville WTP
Infrastructure
Bidding
Port Saint Lucie, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

Sump Pumps
Post-Bid
Lakeland, FL 33801

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

North Regional Water Reclamation Facility Master Reuse Wet Weather Management Well System
Results
Palmetto, FL 34221

Holly Hill Water Production Facility Upper Floridan Production Well No 2
Infrastructure
Bidding
$768,700 est. value
Davenport, FL 33837

Solid Waste Flygt Pump
Post-Bid
FL

Submersible Wastewater Pumps
Results
Live Oak, FL

Well Assessment and Rehabilitation
Term Contract, Infrastructure
Bidding
New Smyrna Beach, FL

Pump W/1" NPT Ports
Post-Bid
Lakeland, FL

Wetwell, Tank and Pipe Cleaning and TV Inspection Services
Results
Jacksonville Beach, FL

Norwood WTP Improvements Phase 2 - Production Wells WATR2002B
Infrastructure
Bidding
$2,200,000 est. value
North Miami Beach, FL

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Last Updated 10/20/2021 02:04 PM
Project Title

4110--Replace Chilled Water Pumps

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32608   (Alachua County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A qualified contractor must be brought in to replace existing 50 HP CW pumps 1, 2 and 3 with 100 HP pumps. Additionally, remove and replace existing isolation and check valves, strainers and variable speed drives. Install a closed loop, chemical free, water treatment system. Connect the variable speed drives to the Desigo BAS.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents