Last Updated | 03/31/2023 12:07 PM |
Project Title | RFP Construction Manager at Risk - The Gypsum Wastewater Treatment Plant Expansion and Improvements Project |
Physical Address | View project details and contacts |
City, State (County) | Gypsum, CO 81637 (Eagle County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town of Gypsum (Owner) is seeking a qualified firm or team to perform Construction Manager at Risk (CMAR) services for the Gypsum Wastewater Treatment Plant Expansion and Improvements Project (Project). CMAR Services for the Gypsum WWTP Expansion and Improvements including Phase I Preconstruction Services and Phase II Construction Services. The Proposals will be reviewed and evaluated using a competitive, best-value selection process described in the RFP. At completion of the evaluation process, the Owner will select a Proposer to award, or enter into negotiations for award of, the CMAR Contract. The Work to be performed includes preconstruction and construction phase services for the construction of the Project. The Project includes construction the of following recommended improvements: An influent lift station with submersible sewage handling pumps with overflow storage. A 2,550 square foot Headworks Building in compliance with NFPA 820 to house new mechanical screens and grit removal. A Johannesburg secondary process designed to comply with CDPHE Policy WPC-DR-1 and capable of treating wastewater to meet the effluent requirements of Regulation 85. Items included in this process are listed below: - Four secondary process basins with five zones each (sludge denitrifying, anaerobic, anoxic, swing, and aerobic) - Three secondary clarifiers A 4,600 square foot secondary process building to house new blowers, process pumps, chemical feed tanks, chemical feed equipment, and associated equipment, and electrical gear for the secondary process. Coagulation/flocculation process and tertiary filtration. A 2,250 square foot ultraviolet (UV) disinfection building to house UV disinfection modules, non-potable water system, chemical feed tanks, chemical feed equipment, and effluent flow metering. Solids handling processes to treat and dewater biosolids generated from the new Johannesburg process. Items included in this process are listed below: - Aerobic digesters - A 4,350 square foot digester complex process building to house new digester blowers, sludge pumps, dewatering equipment, and electrical room. - A 1,500 square foot dewatered solids truck loading area. Interested parties shall contact the Owner to acknowledge receipt of the RFP and obtain an invitation the pre-proposal meeting if attending remotely. MBE (10.2%), WBE (6.9%) All questions or comments should be directed to the Owner contact as follows: Jim Hancock Assistant Town Manager/Engineer Town of Gypsum 50 Lundgren Blvd. P.O. Box 130 Gypsum, CO 81637 (970) 524-1728 jim@townofgypsum.com |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |