Similar Projects
Roundabout Cooley Mesa Rd/Siena Lake Parkway - Town of Gypsum
Infrastructure
Conception
$1,000,000 CJ est. value
Gypsum, CO 81637

Jules Drive and Highway 6 Roundabout or Traffic Light - Town of Gypsum
Infrastructure
Conception
$2,500,000 CJ est. value
Gypsum, CO 81637

Highline Doubletree
Addition, Demolition, Build-out, Renovation, Infrastructure - 45,250 SF
Design
$13,600,000 CJ est. value
Vail, CO 81657

Edwards RiverPark
New Construction, Infrastructure - 36,500 SF
Design
$215,700,000 CJ est. value
Edwards, CO 81632

I-70 Vail Pass Auxilary Lane
Infrastructure
Bidding
$20,000,000 CJ est. value
Edwards, CO 81632

Eagle County Regional Airport
Infrastructure
Bidding
$500,000 CJ est. value
Gypsum, CO 81637

East Park Improvements and North Restrooms, Harry A. Nottingham Park
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Avon, CO 81620

Midland Avenue Streetscape Project
Infrastructure
Post-Bid
Basalt, CO 81621

Wastewater Treatment Facility Headworks and Clarifier Project
Alteration
Results
Less than $800,000 est. value
Basalt, CO 81621

ADA Curb Ramp Improvements at Various Locations
Infrastructure
Results
$1,000,000 CJ est. value
Edwards, CO 81632

Vail Health Northstar Center
Demolition, New Construction, Infrastructure, Build-out - 170,000 SF
Construction
$5,000,000 CJ est. value
Edwards, CO 81632

Lionshead Place / Multi-Residential
New Construction, Infrastructure
Pending Verification
$1,100,000 CJ est. value
Vail, CO 81657

435 Eby Creek Apartments
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Eagle, CO 81631

Village Plaza Building 2 / Sushi Oka
Addition, Demolition, Infrastructure
Design
$90,000 CJ est. value
Vail, CO 81657

Airport improvements
Infrastructure
Bidding
$300,000 CJ est. value
Gypsum, CO 81637

Last Updated 03/31/2023 12:07 PM
Project Title

RFP Construction Manager at Risk - The Gypsum Wastewater Treatment Plant Expansion and Improvements Project

Physical Address View project details and contacts
City, State (County) Gypsum, CO 81637   (Eagle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Gypsum (Owner) is seeking a qualified firm or team to perform Construction Manager at Risk (CMAR) services for the Gypsum Wastewater Treatment Plant Expansion and Improvements Project (Project). CMAR Services for the Gypsum WWTP Expansion and Improvements including Phase I Preconstruction Services and Phase II Construction Services. The Proposals will be reviewed and evaluated using a competitive, best-value selection process described in the RFP. At completion of the evaluation process, the Owner will select a Proposer to award, or enter into negotiations for award of, the CMAR Contract. The Work to be performed includes preconstruction and construction phase services for the construction of the Project. The Project includes construction the of following recommended improvements: An influent lift station with submersible sewage handling pumps with overflow storage. A 2,550 square foot Headworks Building in compliance with NFPA 820 to house new mechanical screens and grit removal. A Johannesburg secondary process designed to comply with CDPHE Policy WPC-DR-1 and capable of treating wastewater to meet the effluent requirements of Regulation 85. Items included in this process are listed below: - Four secondary process basins with five zones each (sludge denitrifying, anaerobic, anoxic, swing, and aerobic) - Three secondary clarifiers A 4,600 square foot secondary process building to house new blowers, process pumps, chemical feed tanks, chemical feed equipment, and associated equipment, and electrical gear for the secondary process. Coagulation/flocculation process and tertiary filtration. A 2,250 square foot ultraviolet (UV) disinfection building to house UV disinfection modules, non-potable water system, chemical feed tanks, chemical feed equipment, and effluent flow metering. Solids handling processes to treat and dewater biosolids generated from the new Johannesburg process. Items included in this process are listed below: - Aerobic digesters - A 4,350 square foot digester complex process building to house new digester blowers, sludge pumps, dewatering equipment, and electrical room. - A 1,500 square foot dewatered solids truck loading area. Interested parties shall contact the Owner to acknowledge receipt of the RFP and obtain an invitation the pre-proposal meeting if attending remotely. MBE (10.2%), WBE (6.9%) All questions or comments should be directed to the Owner contact as follows: Jim Hancock Assistant Town Manager/Engineer Town of Gypsum 50 Lundgren Blvd. P.O. Box 130 Gypsum, CO 81637 (970) 524-1728 jim@townofgypsum.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents