Similar Projects
Reported | 08/15/2020 12:00 AM |
Project Title | Fire Station Hot Water System Re-Pipe |
Physical Address | View project details and contacts |
City, State (County) | Riverton, UT 84065 (Salt Lake County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All piping, valves, and necessary related items will be replaced in both the hot water system. The current hot water system is copper pipe with a recirculation pump. The water heater is on the opposite side of the bay from the primary hot water use areas, thus the recirculation pump runs continuously. As a result, the pipe walls are thin and pin holes have become a regular occurrence. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |