Similar Projects
Proposition 4 - Tulsa Public Schools
Renovation
Conception
$90,695,000 CJ est. value
Tulsa, OK 74103

Interior Construction Remodel
Renovation
Post-Bid
Sand Springs, OK

Cafeteria Improvements at Edison Preparatory
Renovation
Post-Bid
$2,500,000 est. value
Tulsa, OK

Phase 3- General Construction Remodel
Renovation
Results
Sand Springs, OK

CPHS PE Gym Remodel- General Construction and Wood Floor
Renovation
Results
Sand Springs, OK 74063

Berryhill High School
Renovation, Addition
Pending Verification
Tulsa, OK 74107

2025 Bond - Phase 3 - Collinsville Public Schools
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Collinsville, OK 74021

Broken Arrow Public Schools Event Center
Renovation - 114,000 SF
Post-Bid
$61,000,000 est. value
Broken Arrow, OK 74012

Innovation Lab Phase II
Renovation - 13,000 SF
Results
$2,540,917 est. value
Tulsa, OK 74133

Tulsa Honor Academy High School Basement renovation
Renovation - 8,824 SF
Pending Verification
$1,522,908 CJ est. value
Tulsa, OK 74112

Bixby Public Schools Track Building
New Construction
Post-Bid
$2,638,000 est. value
Bixby, OK 74008

District Wide Building-Automation Systems Upgrades
Renovation
Results
$300,000 est. value
Tulsa, OK 74103

Collinsville Public Schools - High School Multipurpose and Softball
Renovation
Post-Bid
$500,000 est. value
Collinsville, OK

Secure Entry and Facade at Memorial High School
Renovation
Results
$1,301,386 CJ est. value
Tulsa, OK 74135

Bixby West Expansion
Addition - 180,867 SF
Post-Bid
$17,500,000 est. value
Bixby, OK 74008

Last Updated 01/17/2023 09:58 AM
Project Title

Jenks East Intermediate Building a Re-Roof

Physical Address View project details and contacts
City, State (County) Tulsa, OK 74137   (Tulsa County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $517,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

For Jenks East Intermediate Building a Re-roof Construction Start Date: Thursday, May 30, 202 Construction Completion: Tuesday, August 1, 2023 The bidding process will be in compliance with the Public Competitive Bidding Act of 1974. Bids must be accompanied by a bid security in the amount of 5% of the bid. By this notice, all provisions of the act apply to this project and are incorporated into notice by reference. Contractor qualification statement must be submitted with Bid. Attention is called to the fact that a designated completion date for the project shall be established based upon Calendar Days to Complete provided by the Bidder. There shall be a $500 Liquidated Damages Clause for each day the contract is not completed. Failure to comply with the above bid requirements will result in return of unopened Bid Proposal. All printing costs are the responsibility of the bidder. Bid Documents may be reviewed at the following locations: Southwest Construction News Data & Analytics Construct Connect Owner reserves the right to reject any or all bids and to waive informalities or minor irregularities in any bid. If the Contract Price is in excess of $100,000.00, Contractor will furnish the following bonds: (i) a Payment Bond (the "statutory" bond required by Section I of Title 6 1, Okla. State, as amended) in an amount equal to 100% of the Contract Price; and (ii) a Performance Bond in such form as directed by Owner in an amount equal to 100% of the Contract Price for work on the project(s) as security for the proper and prompt completion of the Work in accordance with the contract and bidding documents; and (iii) a Warranty Bond in an amount equal to 100% of the Contract Price for work on the project(s) to protect Owner against defects in workmanship and materials for a period of one (1) year from Owner's acceptance of the Project(s); or (iv) a Letter of Eligibility notarized by the bonding company verifying the ability of the Contractor to be bonded for the total amount of the project as specified in the project manual. The Surety on all bonds of the successful bidder must be approved in the Treasury Department Circular 570. If the Surety Company is not on the list, those bids shall be rejected.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents