Similar Projects
West Lane Bridge Slope Repair - City of Stockton
Alteration
Conception
$480,000 est. value
Stockton, CA 95214

Aurora Street Over Mormon Slough Bridge - WT22035 - City of Stockton
Alteration
Conception
$347,000 est. value
Stockton, CA 95202

TRA VIGNE Mixed Use Development
New Construction, Infrastructure
Design
$388,000,000 CJ est. value
Stockton, CA 95202

Beautification Clean California Project
Infrastructure
Design
$300,000 CJ est. value
Lodi, CA 95240

RFP McKinley Park Renovation
Infrastructure
Bidding
$11,000,000 CJ est. value
Stockton, CA 95206

RFQ Contractor - Tracy Multi-Generational Recreation Center
Demolition, New Construction, Infrastructure - 61,300 SF
Bidding
$65,000,000 CJ est. value
Tracy, CA 95376

Able Charter Schools
Demolition, New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Stockton, CA 95207

RFP Design - Senior Housing Project
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Escalon, CA 95320

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

2021/22 Pavement Resurfacing Project
Infrastructure
Results
$1,198,240 CJ est. value
Lodi, CA 95240

O'Reilly Auto Parts (ST6) #6255 / Stockton
New Construction, Infrastructure - 7,022 SF
Construction
$1,800,000 CJ est. value
Stockton, CA 95209

West Eighth Street Mixed Use Development.
New Construction, Infrastructure - 93,804 SF
Pending Verification
$22,500,000 CJ est. value
Stockton, CA 95206

CNG Fueling Station
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tracy, CA 95376

Banner Island Ball Park Upgrade - EV23607 - City of Stockton
Renovation, Infrastructure
Conception
$2,811,000 est. value
Stockton, CA 95203

Safety project / Clean California project
Infrastructure
Design
$3,750,000 CJ est. value
Stockton, CA 95206

Last Updated 10/18/2023 08:02 PM
Project Title

Nile Garden Well 30 Equipping Project

Physical Address View project details and contacts
City, State (County) Manteca, CA 95337   (San Joaquin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $6,502,952 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as the Nile Garden Well 30 Equipping Project according to plans and specifications and according to the contract documents. The Work includes the construction and installation of a potable water well site which includes well pump building, site improvements and fencing, landscaping, irrigation piping and valving, manganese and arsenic treatment systems, pumps, and instrumentation equipment, and approximately 6,500 linear feet of 12-inch pipeline to serve Nile Garden Elementary School. Bid guarantee in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance. Project shall have Substantial Completion with 365 calendar days and Final Completion within 395 calendar days from the date specified in the Notice to Proceed. Time for commencement and completion of the work is important. Time is of the essence in completing contract work in the specified number of calendar days. Any time delays due to chain supply issues will be handled on a case-by-case basis. The successful bidder will be required to furnish a Payment bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. All bonds submitted shall be from admitted sureties. The deadline to submit questions is 5:00 p.m. Pacific Standard Time on October 11, 2023. Questions regarding the contract documents shall be submitted in writing to: Attn: Frank Guillory & Kyzen Nicolas City of Manteca Department of Engineering 1001 West Center Street Manteca, CA 95337 email: fguillory@manteca.gov and knicolas@manteca.gov The City reserves the right to reject any or all bids; to make any awards or any rejections in what it alone considers to be in the best interest of the City

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents