Similar Projects
2022 Stormwater Pipe Rehabilitation Project - CIPP Lining Method
Infrastructure
Bidding
$650,000 est. value
Peachtree City, GA

Thompson Road Sewer Replacement
Infrastructure
Bidding
$300,000 est. value
Perry, GA 31069

Sewer Cleaning and Mapping
Post-Bid
Jekyll Island, GA

Annual On-Call Water and Sewer Emergency Repair
Term Contract
Post-Bid
Stockbridge, GA

Splost North Mainland Phase III Force Main Improvement
Results
Less than $2,800,000 est. value
Brunswick, GA 31520

2019 CDBG Sanitary Sewer Improvements
Results
Less than $503,286 est. value
Vienna, GA 31092

Sanitary Sewer Ream and Reline (8 Inch DIP)
Infrastructure
Bidding
$200,000 est. value
Flowery Branch, GA

Upper North Oconee (UNO) Interceptor Phase 2C
Post-Bid
Athens, GA

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

GEFA Sanitary Sewer Improvements
Infrastructure
Bidding
$600,000 est. value
Metter, GA

Grease Trap Services (Plant Services)
Post-Bid
Athens, GA

Annual Contract Installation of Water/Sewer Lines
Term Contract
Results
Less than $8,355,125 est. value
Calhoun, GA 30701

Sunhill Road Sewer Line Project
Infrastructure
Bidding
$50,000 to $60,000 est. value
Sandersville, GA 31082

Grease Trap Pumping
Post-Bid
GA

Northside Water (Edgewood Circle) System Improvements
Results
Fort Oglethorpe, GA 30742

Last Updated 05/18/2022 07:49 AM
Project Title

Church Street and Jessie Davis Park Water and Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Douglasville, GA 30134   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the rehabilitation of sanitary sewer lines and renewal of sewer services on Church Street and through Jessie Davis Park along with renewal of water services on Church Street. On Church Street the work to be performed includes pipe bursting of approximately 3,810 linear feet of 8-inch clay pipe and installation of approximately 3,810 linear feet of 8-inch HDPE pipe grouted into the existing manholes, installation of one new doghouse manhole at James Street/Broad Street, replacement of approximately forty-eight (48) taps and service laterals on the sewer line, replacement of approximately two (2) service laterals into manholes, and abandonment of approximately twelve (12) sewer taps and services. Work on Church Street also includes renewal of twenty-four (24) ¾” potable water service lines, eight (8) 1” service lines, and five (5) 2” service lines, along with replacement of one (1) 6” gate valve and abandonment of one (1) service line. In Jessie Davis Park the work to be performed includes pipe bursting approximately 1,350 linear feet of 12-inch clay pipe and installation of 1,350 linear feet of 12-inch HDPE pipe grouted into the original manholes and replacement of two (2) sewer taps and service laterals into manholes.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents