Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

ID Bor Lake Cascades (1) Dam Crest Road Improvements
Term Contract
Design
Cascade, ID

Constructing a New Eastbound Port of Entry (POE) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
ID

US-26 / SH-39, FY22 W Pavement Preservation
Infrastructure
Bidding
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Gaoa - Salmon River Road Corridor Rec. Site Maintenance (Surface Rock) 4Cn
Term Contract
Design
$100,000 to $250,000 est. value
ID

For the Work of Rehabilitating the Roadway on SH-55 between MP 101.545 and 108
Infrastructure
Bidding
ID

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Interchange on US-95 / US-12
Infrastructure
Bidding
ID

2022 Road Improvement Projects
Infrastructure
Post-Bid
Hayden, ID 83835

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Last Updated 03/17/2022 01:21 PM
Project Title

Kathleen Avenue Improvements

Physical Address View project details and contacts
City, State (County) Coeur d'Alene, ID 83815   (Kootenai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes: Widening of Kathleen Avenue to the south to provide an additional through lane between US95 and Government Way. The project also includes, curb, sidewalk, and new storm facilities. City forces will be self-performing signal improvements and the installation of storm water tanks.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents