Similar Projects
Pump and Motor Repair Services
Infrastructure
Bidding
Monroe, NC

Rebuilding of Pumps for Fuel Farm
Post-Bid
Elizabeth City, NC 27909

Burton Park Castle Hayne Monitoring Wells
Post-Bid
Jacksonville, NC 28541

Bladen County Water District - Phase IV, Contract 2 - Production Well Project
Results
NC

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

Ostwalt Amity Area Water System Expansion Contract II - Well Buildings
Post-Bid
NC

Well Supply System Disinfectant Modifications and Distribution System Improvements
Results
$400,000 est. value
Hot Springs, NC 28743

Lower Rocky River Pump Station Screening and Influent Gate Replacement
Post-Bid
Harrisburg, NC 28075

Bypass Pumping for Declared Emergencies
Term Contract
Results
Charlotte, NC 28216

Turbo Molecular Vacuum Pump
Post-Bid
Raleigh, NC 27695

Construction of 2 New Water Supply Wells Serving
Results
Less than $392,000 est. value
Wallace, NC 28466

Well 11 Motor Replacement
Post-Bid
Kinston, NC

16" PTO Pump-NCFS
Results
Raleigh, NC 27699

Replace Pumps and Controls B3881
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC 28533

Pendergrass Chlorine Booster Pump System
Results
Sanford, NC 27330

Last Updated 12/03/2021 09:10 AM
Project Title

Feedwater Pump Replacement and Installation - 21

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor capable of replacing an existing Feedwater Pump and performing installation of subsidiary equipment at the Central Steam Plant on the University campus.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents