Similar Projects
Landing Rehabilitation Contract 1 Marine Improvements
Bidding
Pawtucket, RI

URI Reconstruction NBC Pier PHI
Bidding
Providence, RI

Design and Construction Services for Marina Park Boat Ramp and Town Dock
Post-Bid
Wakefield, RI 02879

River Road Kayak Launch Project
Results
$78,150 est. value
Providence, RI 02903

Infrastructure Improvements - Davisville Pier 2 South Face Bulkhead
Results
North Kingstown, RI 02852

Fender Pile Repair
Results
$250,000 to $500,000 est. value
Newport, RI 02841

Repairs of Various Docks at Port of Galilee
Results
Narragansett, RI 02882

2020-2021 Sand Point Emergency Operation Dock
Results
Portsmouth, RI 02871

Oakland Beach Boardwalk Improvements
Term Contract
Results
$140,738 est. value
Warwick, RI

Police Cove Transient Dock
Results
Barrington, RI 02806

Construction of Pier and Landside Improvements for Electric Boat
Results
North Kingstown, RI 02852

Freshwater Boat Ramp Improvements at Olney Pond-Lincoln Woods State Park
Results
Lincoln, RI 02865

Mooring Installation, Maintenance and Repair
Results
Block Island, RI 02807

Repairs to Port of Galilee North Bulkhead Phase 2A (Design/Build)
Results
Providence, RI

Installation/Removal of Freshwater and Saltwater Docks and Gangways - DEM
Term Contract
Results
Providence, RI

Last Updated 02/12/2020 01:07 PM
Project Title

Owner's Program Management Services for the Phase 1 Improvements at the University of Rhode Island, Narragansett Bay Campus

Physical Address View project details and contacts
City, State (County) Narragansett, RI   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Projects included in the Phase 1 & Phase 2 improvements are as follows: 1. Removal of Existing Pier and Installation of New Pier to support the next class of Research Vessel that will arrive in early 2022. A. Pier Design includes orientation into bay, pier deck elevation, loading & unloading areas, moon pool, davit, fueling operations, salt water intake pump station, and on-pier science laboratory. B. Modifications to utilities and roadway approach to pier to support the required new elevation of the pier to accommodate the new vessel and expected sea level changes over the life of the pier. 2. Relocation/elevation of Pier Road 1. Relocation and elevation of the western section of Pier Road and associated utility infrastructure including water, gas, electric, and telecommunications services further west to accommodate campus building expansion and consolidation of parking. Electric and telecommunications infrastructure is recommended to be located underground to provide campus resiliency and reduce visual clutter.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents