Similar Projects
Murphy USA #7171/7856 / Russellville
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Russellville, AL 35653

RFQ - Lee County Cooperative Aerial Project 2023
Infrastructure
Conception
Auburn, AL 36830

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

Sacred Heart of Jesus Catholic Church Gym Addition
Addition, Infrastructure
Design
Anniston, AL 36207

Belforest Water System Raw Water Main K-6 Well #5 to Larry Street Road WTF #4
Infrastructure
Bidding
$400,000 CJ est. value
Daphne, AL 36526

Belforest Water System Raw Water Main K-6 Well #5 to Larry Street Road WTF #4
Infrastructure
Bidding
$400,000 CJ est. value
Daphne, AL 36526

Demolition of Auditorium at W.S. Neal High School
Demolition, Infrastructure
Sub-Bidding
$290,000 CJ est. value
East Brewton, AL 36426

Demolition of Substandard Structures
Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Anniston, AL 36201

Meter Boxes and Lids for the Madison County Water Department
Term Contract
Post-Bid
Huntsville, AL 35811

Meadow Court / Avenue "Q" Ensley
Post-Bid
Birmingham, AL 35232

Craft Highway 20" Water Main
Results
Mobile, Prichard, AL

Contract No. 1 - Water Distribution Mains
Results
Less than $510,000 est. value
Notasulga, AL

Rural King - Building and Site Work
New Construction, Infrastructure - 86,439 SF
Construction
Albertville, AL

The Taylor
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Opelika, AL 36801

ArchCo North Dean Road
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Auburn, AL 36830

Last Updated 08/05/2022 10:03 AM
Project Title

Forrester Sewer Line Repairs for Enterprise State Community College

Physical Address View project details and contacts
City, State (County) Enterprise, AL 36330   (Coffee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood Inc. PLEASE NOTE: The estimated value listed for this project is for searchability purposes only and does not reflect the actual construction budget as determined by the owner. It should not be used for estimation purposes at this time. The Work of the project includes, but is not limited to: storm drainage line removal, tree removal, coordination and supervision of the entire project, and all related work; as indicated on the Bid and Construction Documents. A cashiers check or bid bond payable to ALABAMA COMMUNITY COLLEGE SYSTEM in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidders proposal. Performance and statutory Labor and Material Payment Bonds, insurance in compliance with requirements, and verification of E-Verify enrollment will be required at the signing of the Contract. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner; The bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include their current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of SIXTY (60) days. This project is being bid EXCLUDING TAXES, and requires the Contractor comply with the requirements of Act 2013-205, which was signed into law on May 9, 2013. The Contractor and the Owner will be required to apply for Certificates of Exemption with the Alabama Department of Revenue which will handle administration of the Certificates. The Contractor shall account for the tax savings on the Proposal Form. Additional qualifications and requirements for General Contractor Bidders and separate Subcontractors are indicated in the Bid and Contract Documents. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the Owner will thereby be promoted.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Facility Storm Drainage, Facility Storm Drainage Piping.
Division 31 - Earthwork, Selective Tree and Shrub Removal and Trimming.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents