Similar Projects
CPS Eisenhower ES ACM Removal
Bidding
Darien, IL 60561

Asbestos Abatement Services
Bidding
Chicago, IL 60652

Lead Based Paint and Asbestos Risk Assessment
Term Contract
Post-Bid
Rock Island, IL 61201

Lead (Based Paint) Hazard Reduction Program (LHRP)
Post-Bid
Rock Island, IL 61201

Asbestos Abatement
Results
Highland, IL 62249

Pre-Demolition Asbestos Abatement
Results
Gurnee, Highland Park, Riverwoods, IL 60015

CPS Talcott Elementary School ACM Abatement
Bidding
Chicago, IL 60622

Multifamily Recycling Collection
Term Contract
Post-Bid
Champaign, IL 61820

Asbestos Abatement at Pershing West Magnet School
Results
Chicago, IL 60616

Asbestos Abatement
Bidding
Calumet City, IL 60409

Lead (Based Paint) Hazard Reduction Program (LHRP)
Post-Bid
Moline, IL 61265

Single Family Rehabilitation Program
Results
Less than $30,552 est. value
East Moline, Moline, IL 61244

Lead (Based Paint) Hazard Reduction Program (LHRP)
Term Contract
Post-Bid
Moline, Rock Island, IL 61201

Lead Service Line Replacement
Results
Oswego, IL 60543

ACM and LBP Abatement/Mitigation at Nixon Elementary School
Renovation
Post-Bid
Chicago, IL 60639

Last Updated 12/17/2020 10:03 AM
Project Title

Elgin High School Domestic Water Piping Replacement - Final Phase Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Elgin, IL   (Kane County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of ALL thermal system insulation within glovebag mini-enclosures within the lower level automotive area and former shop areas. Also, removal of ALL thermal system insulation by gross removal in restrooms. The Contractor is responsible for select demolition of block walls with pipe fittings embedded in them. The General Contractor will be responsible for the demolition of the top portion of the pipe chases. Removal of ALL thermal system insulation within glovebag minienclosures.

Details

Division 02 - Existing Conditions, Asbestos Remediation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents