Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Morton Fueling Station Rebid
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Spokane, WA 99207

Precast Concrete Products - Value Blanket
Alteration
Post-Bid
Spokane, WA

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Russell Creek Project
Alteration
Post-Bid
WA

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Last Updated 11/18/2022 10:19 AM
Project Title

DSTT State of Good Repair Curved NB1612 Rail Replacement

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,752,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing embedded rails between Stations NB1035+50 and 1040+70 in the Downtown Seattle Transit Tunnel (DSTT) in and south of the Link Light Rail Westlake Station; provide secure staging area, transport, and weld owner-supplied pre-curved girder rails; embed the replacement rail in polymer grout; protect existing track boxes, track drains and electrical pull boxes, bond the replacement rails to the signal system at the current track box locations, provide survey and alignment controls, provided fencing to separate the work and staging areas from operational and public areas. With additional work which may be authorized in the north bound (NB) and south bound (SB) trackway. Question Deadline 08/17/2022 05:00:00 PM PT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents