Similar Projects
Circle K 1461 Environmental Remediation
Term Contract, Infrastructure
Design
Seattle, WA 98112

Shoreline Management Shoreline Substantial Development
Demolition, Infrastructure
Bidding
$60,000 CJ est. value
Hunts Point, WA 98004

5 Year Blanket Purchase Agreement (BPA) for Hazardous Waste Removal Services for Various Nwfsc Facilities Located in Washington State and Oregon
Term Contract
Sub-Bidding
Seattle, WA 98164

Permitting Abatement and Hazardous Materials Services
Infrastructure, Alteration
Post-Bid
Seattle, WA

Lindbergh High School Modernization and Additions - BP-02.1 Abatement and Demolition
Demolition, Alteration
Post-Bid
$114,000 est. value
Renton, WA 98058

2022-2024 Hazardous Building Materials Abatement and Selective Demo Work Order
Alteration
Results
$750,000 est. value
Seattle, WA

Rainier Beach High School Bid Packages - 06, 07, 08
Demolition, Alteration
Results
$70,000 est. value
Seattle, WA 98118

On Call Snow Removal Services
Term Contract
Post-Bid
Seatac, WA 98188

Greenbridge Scattered Site Abatement and Demolition Project
Term Contract, Demolition, Infrastructure
Results
$68,680 CJ est. value
Seattle, WA 98164

King County Metro Equipment RFP (Request For Proposal) - South Facilities (SF) Building
Term Contract
Post-Bid
Seattle, WA 98164

Three Rectangular Rapid Flashing Beacon Crosswalks
Infrastructure
Results
$335,338 CJ est. value
Redmond, WA 98052

Rainier Beach High School Replacement - Bid Package 15 - Miscellaneous Specialties & Furnishings
Renovation
Post-Bid
$80,000,000 CJ est. value
Bellevue, WA 98005

UW South Campus Center Room 316 Renovation
Renovation
Results
$198,900 CJ est. value
Seattle, WA 98195

Ballard House Asbestos Abatement
Term Contract, Renovation
Post-Bid
$30,000 CJ est. value
Seattle, WA 98107

Parker Property Demolition
Demolition, Infrastructure
Results
$128,590 CJ est. value
Sammamish, WA 98075

Last Updated 07/12/2023 11:42 AM
Project Title

Fishermen's Terminal Bank Building (C-12) Demolition

Physical Address View project details and contacts
City, State (County) Seattle, WA 98119   (King County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $320,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The project will demolish the existing Fishermen's Terminal Bank Building (Building C-12). The work will include abatement of regulated materials, small amounts of material salvage such as the bank vault door, demolition of the structure to existing slab, and removal of existing landscaping including curb and gutter on the site. Capping of the utilities (water, sewer, electric) will be required. A handhole will be installed for the electricity to provide for access for temporary power connection for construction job shack in future. Crushed rock will be placed in existing landscape area. No paving or addition of any new impervious surface will be included in the work. Question Cut-off Date: Jul 4, 2023, 6:30:00 AM *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents