Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Ronald Wilson Reagan High School HVAC Replacement
Design
Pfafftown, NC 27040

North Campus Building N105 AHU 3 Replacement
Alteration
Bidding
Salisbury, NC

Dabney Hall Upgrade Phase 3 - 8th Floor
Alteration
Bidding
Raleigh, NC 27607

Installation of 60-ton AAON HVAC Unit
Post-Bid
Beaufort, NC 28516

HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Charlotte, NC 28277

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Unc School Of The Arts Residence Hall HVAC Phase 2
Construction
Winston-Salem, NC

Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

Vandalia Chiller Replacement
Alteration
Bidding
$210,000 est. value
Greensboro, NC 27406

Cooling Tower New Marley OEM Stainless-Steel Casing Panels Replacement
Post-Bid
Raleigh, NC 27616

911 Emergency Communication Backup Facility Hvac
Results
Durham, NC 27704

Joyner Chiller Replacement
Alteration
Bidding
$210,000 est. value
Greensboro, NC 27408

HVAC Contractors to replace 15, 1.5 ton residential HVAC systems at 118-12
Renovation
Post-Bid
Garner, NC

Last Updated 11/18/2021 03:09 PM
Project Title

Ventilation Upgrade

Physical Address View project details and contacts
City, State (County) Cherokee, NC 28719   (Swain County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Conditioned Fresh Air Supply Replace Existing AAON RM-010-8-0-AA02-152 Outdoor air handling unit with a new unit capable of delivering 6,000 CFM. Unit shall provide sufficiently dry air that the internal relative humidity stays at or below 50% at a temperature of 70 degrees, F. The existing ductwork supplies Fan Coil Units 1 to 21 most being located on the first floor of the building. Additional supply ducting shall be added to provide conditioned air to the basement air handler AHU-3 (intake is located behind existing AAON unit). Remove any existing lovers/obstructions in the exterior wall. SEE STATEMENT OF WORK SECTION FOR FURHTER DETAILS. Isolation Room (Rooms 111 & 113) Add inline Exhaust Fan capable of removing 150 CFM from each room. It is suggested to connect into the return air ducting accessible from the main corridor. If that is not possible ceilings in bedrooms are a false ceiling. True ceiling is a few feet higher. Any additional return grills added must be tamper resistant and supported by the structure holding the true ceiling. Exhaust shall be vented through the roof and shall be constructed to match existing. Existing exhaust fans in the facility are made by Cook model numbers 70 SQN and 80 DB. Exhaust Fan shall be connected to the Building Automation System with status displayed on the Exhaust Fan screen with the ability to override the unit to an off status.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents