Similar Projects
Lift Station 12 Rehabilitation
Post-Bid
$450,000 to $500,000 est. value
Texas City, TX 77590

Lakeside Estates Lift Station Abandonment
Post-Bid
Hutto, TX 78634

Cullen Regional Lift Station Rehabilitation
Results
Less than $768,600 est. value
Pearland, TX

Ratcliff Lake Lift Station Repairs
Results
$25,000 to $100,000 est. value
Ratcliff, TX

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Booster Station Improvements and SCADA Project
Post-Bid
Hidalgo, TX 78557

Sewer Lift Station
Term Contract
Results
Less than $637,000 est. value
Harlingen, TX 78552

Travis Ranch 3F Lift Station Improvements
Post-Bid
Heath, TX 75087

Riverwalk Lift Station Reconstruction
Results
Less than $408,700 est. value
Pearland, TX 77581

Grigsby Lift Station Rehabilitation Project
Post-Bid
Port Neches, TX 77651

Booster Pump Replacement
Results

CDBG Lift Station Rehabilitation
Post-Bid
Poteet, TX 78065

Custer Road Pump Station Meter Vault Relocation
Results
$3,454,363 est. value
Prosper, TX 75078

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Reported 02/19/2022 12:00 AM
Project Title

Jim Miller Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Dallas, TX 75227   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 21 - Fire Suppression.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents