Reported | 12/02/2019 07:52 AM |
Project Title | Piscataway WWTP Bio-Energy Project |
Physical Address | View project details and contacts |
City, State (County) | Accokeek, MD (Prince Georges County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | |
Project Status | Construction Commenced April 2020 |
Bids Due | View project details and contacts |
Estimated Value | $170,000,000 to $190,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bid Packages: Please note, bid packages are subject to change. 01.11 – Field Testing and Material Sampling 02.22 – Site Utilities 02.24 – Demolition 02.28 – Sitework 02.30 – Asphalt Paving, Curb, Gutter, Sidewalk 02.32 – Erosion Control 02.33 – Fence 03.22 – Concrete 03.24 – Precast Concrete 03.25 – D110 Tanks 03.26 – D115 Tanks 07.22 – Roofing 07.24 – Translucent Panels & Glazing 08.26 – Special Doors 09.22 – Painting and Coatings 09.26 – Architectural 09.27 – Damnproofing 13.22 – Pre-Engineered Metal Structures 13.23 – Cake Storage Canopy 14.22 – Hoisting 15.21 – Gas Treatment 15.23 – Process Mechanical 15.24 – Plumbing 15.26 – HVAC 15.30 – Fire Protection 16.22 – Electrical 17.22 – Instrumentation and Controls Qualified Design Build Firms (Firm) to design and construct the Piscataway Bio-Energy Facility at the Piscataway WWTP in Accokeek, MD. The Piscataway Bio-Energy Facility will be the Commission's centralized biosolids processing facility, capable of receiving solids from all of the Commission's wastewater treatment plants and producing biogas, electricity, and Class A, EQ biosolids. The Piscataway Bio-Energy Facility will involve the design and construction of the following major facilities: Cake receiving and storage Gravity thickener upgrades Screening and pre-dewatering Piscataway solids with belt filter presses Thermal hydrolysis process (THP) Anaerobic digestion Post-dewatering with belt filter presses Combined heat and power (CHP) facility Side-stream nutrient removal facilities Odor control Civil site improvements Controls, instrumentation and electrical facilities. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |