Similar Projects
Regional Wastewater Treatment Facility Buildings/Grounds - TC00180 - City of Fresno
Renovation
Conception
$11,441,800 CJ est. value
Fresno, CA 93706

Regional Wastewater Treatment Facility Headworks - TC00176 - City of Fresno
Renovation
Conception
$2,163,600 CJ est. value
Fresno, CA 93706

Waste Water Treatment Plant Improvement Project
Infrastructure, Renovation
Bidding
$600,000 CJ est. value
Firebaugh, CA 93622

Wastewater Treatment Plant Improvement Project
New Construction
Post-Bid
Riverdale, CA

Replacement of One Makeup Air Unit and Two Air Handling Units in the Headworks Building at the Fresno-Clovis Regional Wastewater Reclamation Facility
Renovation
Post-Bid
$30,000 CJ est. value
Fresno, CA 93721

Temporary Relief of Waste Water Treatment and Sewage Plant Operator
Renovation
Results
Blythe, Chino, Chowchilla, Coalinga, Corcoran, Crescent City, Imperial, Ione, Jamestown, Sacramento, Susanville, Tehachapi, Wasco, CA 91710

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Regional Wastewater Treatment Facility Secondary Treatment - TC00177 - City of Fresno
Renovation
Conception
$4,000,700 CJ est. value
Fresno, CA 93706

Replacement of Spiral Heat Exchanger at Digester 3
Renovation
Results
$149,000 est. value
Fresno, CA 93706

Regional Wastewater Treatment Facility Solids Treatment - TC00178 - City of Fresno
Renovation
Conception
$19,235,000 CJ est. value
Fresno, CA 93706

Northeast Surface Water Treatment Facility (NESWTF) Sodium Hypochlorite Tank Replacement
Renovation
Results
$353,897 CJ est. value
Fresno, CA 93721

Regional Wastewater Treatment Facility Effluent Handling - TC00179 - City of Fresno
Renovation
Conception
$16,030,000 CJ est. value
Fresno, CA 93706

Groundwater System Citect SCADA/Wonderware Historian/Dream Reports Upgrade and Configuration Integration
Renovation
Results
$1,045,914 CJ est. value
Fresno, CA 93721

Regional Wastewater Reclamation Facility Electrical - TC00185 - City of Fresno
Renovation
Conception
$7,588,000 CJ est. value
Fresno, CA 93706

North Fresno Wastewater Reclamation Facility Buildings/Grounds - TC00187 - City of Fresno
Renovation
Conception
$277,400 CJ est. value
Fresno, CA 93730

Last Updated 01/18/2023 05:31 PM
Project Title

Replacement and Repairs of Structural Components at the Regional Wastewater Reclamation Facility(RWRF) Headworks Building- Phase 1

Physical Address View project details and contacts
City, State (County) Fresno, CA 93706   (Fresno County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,981,400 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to, demolition and replacement of existing concrete stair, partial depth concrete slab repairs, precast concrete plank and flange repair, concrete wall and column repair, epoxy injection of concrete wall cracking and concrete durability repairs. The work hereunder constitutes a "public work" as defined in Chapter 1, Part 7, Division 2 of the California Labor Code, and Contractor shall cause the work to be performed as a "public work" in accordance with such Chapter of the California Labor Code. The Council of the City of Fresno has adopted Resolution No. 82-297 ascertaining the general prevailing rate of per diem wages and per diem wages for holidays and overtime in the Fresno area for each craft, classification, or type of worker needed in the execution of contracts for the City. A copy of the resolution is on file at the Office of the City Clerk. Actual wage schedules are available at Construction Management Office, 1721 Van Ness Avenue, Fresno, California 93721, (559) 621-5600. Contractors and Subcontractors must meet any and all requirements of Labor Code sections 1771.1 and 1771.5 prior to submitting bids. All proposals must be made on the Bid Proposal Form provided by the Purchasing Manager. A Bid Deposit, which can be provided separately, in the amount of TEN PERCENT (10%) of the Total Net Bid Amount (or, in bids with Add Alternates, the highest possible combination of theBase Bid plus Add Alternates) in the form of a certified or cashier's check, an irrevocable letter of credit, or a certificate of deposit or a bidder's bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. . All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier's check, which must be brought to the Purchasing Manager's office and labeled accordingly with bid number prior to the bid opening. The City of Fresno hereby notifies all Bidders that no person shall be excluded from participation in, denied any benefits of, or otherwise discriminated against in connection with the award and performance of any contract on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era or on any other basis prohibited by law. Services of an interpreter and additional accommodations can be made available. Requests for accommodations should be made at least five working days but no later than 48 hours prior to the scheduled meeting/event. Please contact the Procurement Specialist on the cover at 559-621-1332 In accordance with provisions of section 22300 of the California Public Contract Code, Contractor may substitute securities for any monies withheld by City to ensure performance under the Contract. A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work Bidders are advised that, as required by the Fresno Municipal Code, the city has established a National Targeted Worker mandatory participation level. Bidders are advised that as required by the Fresno Municipal Code, the City of Fresno is implementing new National Targeted Worker requirements for public work of improvement contracts over $200,000. The mandatory participation level for National Targeted Workers is 15%. No bid will be considered for award unless the Bidder at the time of bid opening, is licensed with a valid Class "B" Contractor's License issued by the State of California. Bidders are advised that this contract is subject to the City's Community Workforce Agreement, a project labor agreement executed by the City and the Fresno, Madera, Tulare, Kings Building Trades Council. Which includes a local hiring program, wherein the contractor must use best faith efforts to meet the hiring percentage requirements for Journey-level and apprentice level project work hours. A copy of the Community Workforce Agreement is attached to the bid solicitation. The City reserves the right to reject any and all bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents