Description |
The work involves selective demolition, site preparation, earthwork, termite control, trenching, concrete floors and walkways, structural steel, masonry, carpentry, roofing, chain link fencing, playground equipment, painting, air conditioning, electrical, fire alarm, plumbing, disturbance of hazardous materials and other related work to construct a new classroom building. The estimated cost is between $2,500,000 and $7,500,000. Contract Duration: 580 Calendar Days Contractor License: B *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - 300980.02 |
Details |
Division 03 - | Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection. | Division 08 - | Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware. | Division 09 - | Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting. | Division 10 - | Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles. | Division 11 - | Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures. | Division 12 - | Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture. | Division 21 - | Fire Suppression. | Division 22 - | Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods. | Division 25 - | Integrated Automation. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting. | Division 27 - | Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems. | Division 28 - | Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm. | Division 31 - | Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment. | Division 32 - | Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses. | Division 33 - | Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities. |
|