Similar Projects
College Avenue - Leonard Street to Sweet Street - City of Grand Rapids
Infrastructure, Alteration
Conception
$542,180 est. value
Grand Rapids, MI 49505

Spectrum Health Butterworth Campus Psy Unit
New Construction, Build-out, Infrastructure
Conception
$8,875,000 CJ est. value
Grand Rapids, MI 49503

MoTown Square Affordable Assisted Living
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Grand Rapids, MI 49507

MoTown Square Affordable Assisted Living
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Grand Rapids, MI 49507

RFP D/B - Playground Design and Installation - New K-5 Playground at Kent City Elementary
Infrastructure
Post-Bid
$152,700 CJ est. value
Kent City, MI 49330

KSZ Spartan Chemical - Remedial Excavation
Infrastructure
Post-Bid
Wyoming, MI 49519

Reconstruction of and Water Main in the Ottawa Avenue/Coldbrook Street/Monroe Avenue Intersection (Decommissioning of Coldbrook Pumping Station)
Infrastructure, Renovation
Results
$4,064,726 CJ est. value
Grand Rapids, MI 49503

Landscaping and Irrigation at the Lake Michigan Filtration Plant
Infrastructure
Results
$170,745 CJ est. value
West Olive, MI 49460

Rivertown Commons Apartments
New Construction
Construction
Grandville, MI 49418

Eastern Lofts Affordable Apartments
New Construction, Demolition - 75,850 SF
Construction
$16,800,000 est. value
Grand Rapids, MI 49503

Breton Grove Apartments / Grand Rapids
New Construction, Infrastructure - 16,395 SF
Pending Verification
$5,000,000 CJ est. value
Grand Rapids, MI 49508

Breton Grove Apartments / Grand Rapids
New Construction, Infrastructure - 16,395 SF
Pending Verification
$5,000,000 CJ est. value
Grand Rapids, MI 49508

Savannah at Waterford Village - Apartments
New Construction, Demolition
Design
Walker, MI 49534

RFQ Construction Manager - Improvements in the Grand River From Fulton Street to I-196 (Grand River Revitalization Project)
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Grand Rapids, MI 49503

Burger-Goodwood Neighborhood Water Main - Phase 1
Infrastructure
Results
$3,862,317 CJ est. value
Grand Rapids, MI 49503

Last Updated 04/21/2023 04:13 PM
Project Title

Replacement of the Motor Control Center at the North Primary Control Building

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49503   (Kent County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $306,400 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City reserves the right to accept or reject any and all Bids; to reject the Bid of a Bidder who is not, in the opinion of the Engineer or City, in a position to perform the contract; to waive informalities, irregularities and technicalities; to reject any and all non-conforming, non-responsive, unbalanced [unreasonable unit price(s)] or conditional Bids; or to advertise for new Bids. The City also reserves the right to award the Contract in the City's best interest, and therefore, may select a Bidder other than the lowest.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents