Similar Projects
2Da--575 - (Con) Install Secondary Domestic Water Service
Term Contract
Design
$25,000 to $100,000 est. value
Grand Junction, CO 81501

Plumbing and Mechanical Systems
Post-Bid
Pueblo, CO 81003

Heating and Plumbing Services
Term Contract
Post-Bid
Arapahoe, CO

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Z1DA--554-21-130 Install DI Water Faucets on Sinks
Results
$25,000 to $100,000 est. value
Aurora, CO 80045

Weatherization Materials - Energy Resource Center
Term Contract, Alteration
Construction
Colorado Springs, CO 80903

Plumbing
Term Contract
Post-Bid
Denver, CO 80223

Water Bottle Filling Stations
Results
Poudre Park, CO

Binney WPF Pilot Plant Plumbing
Post-Bid
$50,000 to $75,000 est. value
Aurora, CO 80016

Annual Maintenance - Plumbing Repairs
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

Arapahoe County Public Drinking Fountain Safety Upgrade
Post-Bid
CO

Eyewash and Safety Showers
Results
Fort Collins, CO 80521

As-Needed Plumbing Services
Term Contract
Post-Bid
Aspen, Carbondale, Glenwood Springs, CO

Cherokee Park SWA Replacement of Vault Toilets
Results
Denver, CO

Pmaa Rmnj Bid - Replace Marina Pedestals, Dock System Svcs
Post-Bid
Aroya, CO 81121

Last Updated 10/14/2021 02:12 PM
Project Title

Z1da--554-21-105 Install Water Softening System (Va-21-00041590)

Physical Address View project details and contacts
City, State (County) Aurora, CO 80045   (Adams County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract shall include of all the labor, material, and equipment to complete the work described in the project drawings and specifications. This work includes but is not limited to the following tasks: Install housekeeping pad. Install packaged water softening system on pad. Install drain lines and supports to existing floor sink. Install electrical power for system. Install domestic water piping, valves, and supports. Install control wiring. Integrate system into BAS and add new points to existing graphics. Flush and sanitize new piping and equipment. Start-up system with assistance from manufacturer’s representative. Train VA personnel on operations and maintenance.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents