Similar Projects
Weatherization Program Refrigerators and Chest Freezers
Term Contract
Post-Bid
Morton, IL 61550

Boiler and Hot Water Heater Maintenance
Term Contract
Post-Bid
Lisle, IL

Mechanical And Plumbing Systems Renovation
Renovation
Results
Less than $4,000,000 est. value
Normal, IL 61790

Boiler Blowdown Header Replacement
Results
Winnetka, IL

SRE/ARFF Building at Decatur Airport
New Construction
Construction
Decatur, IL 62521

Boiler Refurbishment at Barrington High School
Alteration
Post-Bid
Arlington Heights, IL

Heating Hot Water Piping Replacement
Results
Carbondale, IL

Mechanical Unit Replacement
Alteration
Post-Bid
Orland Park, Palos Hills, Tinley Park, IL 60487

Robinson High School Boiler Replacement
Results
Robinson, IL 62454

Boiler Blowdown Tanks
Alteration
Post-Bid
Winnetka, IL

2021 Fire Alarm System, Boiler Upgrades and Freezer Replacement
Results
Loves Park, Machesney Park, IL 61115

Electric, Plumbing, HVAC & Refrigeration/Mechanical
Term Contract, Alteration
Post-Bid
IL

FDC Mechanical Systems/Envelope Upgrades
Results
University Park, IL

Plumbing Mechanical Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Geneva, IL

Fenton HS Ionization Existing Mechanical Equipment
Results
Bensenville, IL 60106

Last Updated 12/09/2022 04:06 PM
Project Title

Mechanical Renovation Project at Various Schools

Physical Address View project details and contacts
City, State (County) Cambridge, IL 61238   (Henry County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,800,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 09, 2022, no bids received. No definite date for the rebid. SCOPE: Bids will be received for all Mechanical Renovation Work. BID SECURITY: Bids shall be accompanied by a Bid Security of at least 10% of the total amount of the base bid and all additive alternate bids. This may be in the form of a certified check, cashier's check, bank draft or bid bond, payable to the Owner as a guarantee that should the bidder be awarded the Work, the bidder will enter into a contract with the Owner and will furnish the proper performance and payment bond within the time limit set by the Owner. Bid securities will be returned to all other bidders when the successful bidder files a proper performance and payment bond and the contract is executed by the Owner. If the successful bidder fails to file such contract and performance and payment bond, the amount of his bid security shall be forfeited to the Owner as liquidated damages. WAGE RULES: Each craft, type of worker and mechanic needed to execute the Contract shall be paid the prevailing wage rate for the locality in which the work is performed, in accordance with all federal laws and laws of the State as well as local ordinances and regulations applicable to the work hereunder and having force of law. PERFORMANCE BOND: A performance and payment bond for the full amount of the Contract will be required of the successful bidder. All costs associated with the bond shall be included in the bid amount. RIGHTS RESERVED The Owner reserves the right to waive any irregularities BY OWNER: and/or reject any or all bids when, in the opinion of the Owner, such action will serve the best interests of the Owner. WITHDRAWAL OF BIDS: No bid may be withdrawn for a period of 60 days after the opening of bids without written consent of the Owner. By order of Cambridge Community Unit School District #227

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents