Similar Projects
Dollar General / Muskegon
New Construction, Infrastructure - 10,640 SF
Design
$3,000,000 CJ est. value
Muskegon, MI 49442

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

Bid Package 7 - North Carr Demolition and Site Renovation
Demolition, Infrastructure
Post-Bid
Muskegon, MI 49442

Muskegon Cf - Parking Lot / Inside Sidewalk
Alteration
Post-Bid
Muskegon, MI 49442

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Dune Harbor Parking Lot Construction
Infrastructure
Results
MI

Muskegon Museum of Art Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$11,200,000 CJ est. value
Muskegon, MI 49440

Northern Biomedical Research Facility
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Muskegon Hts, MI 49444

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Muskegon, MI 49440

Concrete Pavement Reconstruction, Storm Sewer, Concrete Curb, Gutter and Ramps and Pavement Markings on Sherman Boulevard
Infrastructure
Bidding
$1,939,000 CJ est. value
Muskegon, MI 49441

Horton Park Improvements Phase II
Infrastructure
Post-Bid
$200,000 CJ est. value
Muskegon, MI 49445

2022 Street and Utility Improvements
Alteration
Results
$1,679,325 est. value
Whitehall, MI

Adelaide Pointe Hotel / Muskegon
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Muskegon, MI 49441

Last Updated 05/03/2023 04:07 PM
Project Title

Grand Haven Road North Gateway Boulevard to Mount Garfield Road

Physical Address View project details and contacts
City, State (County) Norton Shores, MI 49441   (Muskegon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $67,943 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The engineer’s Estimate is about $81,000. The work will include the placement of concrete sidewalk, ADA ramps, restoration and other related work. Construction shall be in accordance with the Michigan Department of Transportation 2020 Standard Specifications for Construction. The Contractor may begin the work once Notice to Proceed has been issued. All work must be complete by June 30, 2023, or 4 weeks after beginning the work, whichever is sooner. The Construction Contract for the placement of approximately 1,060 linear feet of concrete sidewalk within the City of Norton Shores along the east side of Grand Haven Road between North Gateway Boulevard and Mound Garfield Road. The work will include the placement of 5-foot wide concrete sidewalk, ADA ramps, restoration and other related work. A certified check, bank draft, or bid bond in the sum of not less than five percent (5%) of the amount of the proposal will be required with each bid.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents