Similar Projects
Water Resource Recovery Facility Project - General Construction
New Construction
Bidding
DuBois, PA

Maintenance Building Addition - Truck Bay Project
Addition
Bidding
Warren, PA

General Construction Site I Clarifier Equipment Removal and Replacement Project
Post-Bid
North East, PA

Stormwater Pond Maintenance II
New Construction
Post-Bid
Wexford, PA 15090

Wastewater Treatment Plant Upgrade General
Results
$22,500,000 est. value
Rochester, PA 15074

Wastewater Treatment Plant Upgrade - General Construction
Results
$5,840,000 est. value
Westfield, PA 16950

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

LTTTJMSA Wastewater Treatment Plant (WWTP) - General Construction
Construction
$3,941,500 est. value
Tunkhannock, PA

Clarifier Distribution Box Project
Renovation
Bidding
$25,000 est. value
Freeland, PA

Bethany Village Senior Living Center Sewage Treatment Plant
New Construction
Post-Bid
Lakeville, PA 18438

Wastewater Treatment Plant Headworks Upgrade - General, Mechanical and Electrical Contracts
Results
$900,000 est. value
Oley, PA 19547

Wastewater Treatment Plant Phase II - General Construction
Construction
$6,250,000 to $7,250,000 est. value
Greencastle, PA 17225

2022 Jordan Crossing Wastewater Treatment Plant Upgrades and Renovations Project
Renovation
Bidding
Mohrsville, PA 19541

Providing and Installing Sloping Algae Control Launder Covers
Post-Bid
Mountain Top, PA 18707

Clearwater Wastewater Treatment Plant (WWTP) Energy Enhancements Project - Contract G - General Construction
Results
$10,000,000 to $12,000,000 est. value
Hershey, PA 17033

Last Updated 02/22/2022 11:13 AM
Project Title

Headworks and Solids Handling Upgrade

Physical Address View project details and contacts
City, State (County) Shoemakersville, PA   (Berks County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,900,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally consists of rerouting the existing sanitary sewer entering the site from Second Street to enter the new Headworks Facility as shown on the Contract Drawings. The project also includes the removal of the existing belt filter press, conveyor, and dumpster-veyor from the Solids Handling Building and the installation of a new sludge press, screw conveyor, and dumpster-veyor as shown on the Contract Drawings. Contract One – General Construction

Details

Sewage Treatment Plant, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 41 - Material Processing and Handling Equipment, Conveyors.
Division 46 - Water and Wastewater Equipment, Biological Treatment Systems, Integrated Fixed-film Activated Sludge Equipment, Residuals Dewatering Equipment, Belt Filter Presses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents