Similar Projects
Last Updated | 05/04/2021 10:10 AM |
Project Title | 2021 Pine Tree Lift Station Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Two Rivers, WI (Manitowoc County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal and replacement of the pumps, valves, electrical and controls for the existing steel lift station. The existing wetwell shall be converted to a submersible pump station with a new top section. A new precast concrete valve vault with new piping shall be installed adjacent to the existing wetwell. • Bypass pumping and coordination with the Electric Utility for a new service will be required. • Removal and replacement of concrete sidewalk, roadway and curb & gutter. • Removal and replacement of the existing control panel at the Columbus / Memorial Lift Station |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |