Similar Projects
2021 EDA Storm Water Lift Stations
New Construction
Bidding
$5,146,000 est. value
La Crosse, WI

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Coon Street and Spring Lake Road Lift Station Upgrade
Results
Rhinelander, WI 54501

Pammel Creek Force Main Pig Launching Station
Results
Less than $75,000 est. value
La Crosse, WI

Booster Pumping Station, Contract Package 3 and 3A
Post-Bid
Waukesha, WI 53186

Sanitary Sewer Pump Station - Frame Park Restroom
Results
Waukesha, WI 53188

Lift Stations 1 & 10 Generator Buildings
Renovation
Post-Bid
$345,000 est. value
Pewaukee, WI 53072

Mannville Lift Station Replacement
Renovation
Results
Marshfield, WI 54449

2021 WWTF Upgrade
Renovation
Post-Bid
Eagle River, WI 54521

Lift Station No. 3 Improvements
New Construction
Results
$625,000 est. value
Wind Lake, WI 53185

SMU Lift Station Replacement
Post-Bid
New Franken, WI

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

WWTP Diaphragm Pump Replacement
New Construction
Post-Bid
River Falls, WI

Museum Place Storm Lift Station
Results
Green Bay, WI

Last Updated 05/04/2021 10:10 AM
Project Title

2021 Pine Tree Lift Station Upgrade

Physical Address View project details and contacts
City, State (County) Two Rivers, WI   (Manitowoc County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of the pumps, valves, electrical and controls for the existing steel lift station. The existing wetwell shall be converted to a submersible pump station with a new top section. A new precast concrete valve vault with new piping shall be installed adjacent to the existing wetwell. • Bypass pumping and coordination with the Electric Utility for a new service will be required. • Removal and replacement of concrete sidewalk, roadway and curb & gutter. • Removal and replacement of the existing control panel at the Columbus / Memorial Lift Station

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents