Similar Projects
RR-21-4577 - Plaza Improvements
Bidding
Downers Grove, IL

Resurfacing Eola Road from Oakhurst Drive to US 34 in Aurora
Bidding
Aurora, IL 60505

Supply of Asphalt Emulsion, Sealer Materials
Term Contract
Post-Bid
West Chicago, IL 60185

Poly Fiber Firm Asphalt Crack Sealant Material
Post-Bid
Downers Grove, IL 60515

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

Three School Asphalt Paving
Results
Naperville, IL 60540

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

Resurfacing, Curb And Gutter, Traffic Signals, Sidewalks And Pavement Markings On Grand Avenue, From US 20 To County Line Road In Elmhurst And Bensenville
Bidding
Bensenville, Elmhurst, IL

Crack Sealing Bituminous Pavement
Term Contract
Post-Bid
Addison, IL 60101

2020 Wayne MET Road Program
Results
Less than $275,000 est. value
Wayne, IL 60184

(3.9-Mile) Crack and joint sealing on US 20 (Lake Street)
Bidding
Addison, IL 60101

20-110 Hot-Mix Asphalt Surface Removal
Term Contract
Post-Bid
Wheaton, IL 60187

2020 Paving
Results
$196,500 est. value
Wheaton, IL 60189

Hot-Mix Asphalt
Bidding
Naperville, IL

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

Last Updated 04/15/2021 09:58 AM
Project Title

Pavement Maintenance

Physical Address View project details and contacts
City, State (County) Wheaton, IL   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,049,883
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement Maintenance, Including Hma Surface Removal 2-1/4" - 79,768 Sq Yd; Hma Surface Removal 2-1/2" - 159,361 Sq Yd; Pcc Surface Removal 3" - 20,717 Sq Yd; Polymerized Level Binder (Machine Method) Il-4.75 - 11,503 Ton; Hma Surface Course, Mix "d",n70 - 6880 Ton; Poly Hma Surface Course, Mix "e",n70 - 13,684 Ton; Poly Sma Surface Course, 9.5, Mix "f",n80 - 3845 Ton; Longitudinal Joint Sealant - 145,040 Foot; Pcc Sidewalk Removal - 5267 Sq Ft; Path Removal 1765 Sq Ft; Pcc Sidewalk - 5" - 7167 Sq Ft; Combination Concrete Curb & Gutter Remove And Replacement - 10,063 Foot; Detectable Warnings - 802 Sq Ft; Pavement Patching Class d - 2390 Sq Yd; Drain Str Adj - 97 Ea; Fr&l Adj, Spl - 91 Ea; Thermoplastic Pavement Marking - Line 4" - 162,733 Foot; Recessed Reflective Pavement Marker - 3652 Each; Detector Loop Replacement - 6487 Foot; Maint Exist Traffic Sig - 6 Ea; Handhole Adj - 3 Ea; Relocate Exist Ped Button - 22 Ea; Railroad Prot Liability Insurance - 1 Lsum; Traffic Control And Protection - 1 Lump Sum.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents