Similar Projects
Roadwork - Ashley Hall Plantation Road Right Turn Lane
Infrastructure
Bidding
Charleston, SC 29407

Construction of US 17 to Rifle Range Road Connector
Infrastructure
Bidding
Mount Pleasant, SC

On-Call Pavement Maintenance and Repair
Term Contract, Infrastructure
Post-Bid
James Island, SC

Road Work - Palmetto Commerce Parkway and Crosspoint IX
Infrastructure
Post-Bid
Ladson, SC 29456

2020 Onyx Mastic Surface Treatment Plan TST
Results
North Charleston, SC 29405

Repair Airfield Parking Ramp Joint Base Charleston, SC
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Road Work - Trexler Avenue Improvements TST
Infrastructure
Bidding
Hollywood, SC 29449

Reconstruction/Rehabilitation - District 6
Results

Road Work - Ashely Hall Plantation Road Right Turn Lane TST
Infrastructure
Bidding
Charleston, SC 29407

Reconstruction/Rehabilitation - District 6
Results

Preservation - District 6
Infrastructure
Bidding

Construction of Horton Road and Spaniel Lane
Results
Saint George, SC

2022 Spring Resurfacing
Infrastructure
Bidding
Summerville, SC 29483

Trolley Barn Parking Lot
Results
$450,000 to $600,000 est. value
Charleston, SC 29403

Rosebank Road Improvement Project
Results
North Charleston, SC

Reported 01/11/2022 05:28 AM
Project Title

Reconstruction/Rehabilitation - Charleston/Dorchester Co

Physical Address View project details and contacts
City, State (County) (Charleston, Dorchester Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 2.000 Ea Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 1,048.000 Sy Borrow Excavation 9,621.500 Cy Excavation For Shoulder Paving 2,147.900 Sta Hauling Of Excavated Shoulder Material 2,147.900 Sta Portland Cement For Cement Modified Recycled Base Course 1,589.030 Ton Maintenance Stone 70.000 Ton Liquid Asphalt Binder Pg64-22 2,469.097 Ton Liquid Asphalt Foamed 4,449.280 Ton Milling Existing Asphalt Pavement 2.0" 247,227.523 Sy Milling Existing Asphalt Pavement (Variable) 8,822.000 Sy Milled-In Rumble Strip 41.560 Mi Hot Mix Asphalt Surface Course Type b 43,913.326 Ton Driveway Paving-Surface Type c 855.000 Ton Cold In-Place Recycling -6"Uniform 115,920.170 Sy Cold In-Place Recycling -8"Uniform 314,330.483 Sy Permanent Construction Signs (Ground Mounted) 1,797.000 Sf Pave. Mark.(Temp-Paint)12inx18in White Triangle Yield Bar 168.000 Lf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 26,105.000 Lf 6" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 532.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 70,277.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 85,834.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 56.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 100.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 33.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 25.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 10,230.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 115,940.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 78,315.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 1,596.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 210,831.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 257,502.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 300.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 99.000 Ea White Single Bike Lane Arrow (Lt, Straight, Rt)-Fast Dry Paint 99.000 Ea White Word Message "Only"-Fast Dry Paint 75.000 Ea Bike Lane Symbol - Fast Dry Paint 51.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 30,690.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 347,820.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 4,548.000 Lf White Bike Symbol - Hot Applied Preformed Thermoplastic - 90 Mils 15.000 Ea White Bike Lane Arrow - Hot Applied Preformed Thermoplastic - 90 Mils 29.000 Ea Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 1,304.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 285.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,034.000 Ea Concrete Median 1,009.000 Sy Premash Thriebeam Bridge Conn Tbbc3 4.000 Ea Premash Type t Tl3 Leading 50' 4.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 20.151 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents