Similar Projects
Amador / Newport
New Construction, Infrastructure - 6,400 SF
Design
$2,000,000 CJ est. value
Newport, KY 41071

Amador / Newport
New Construction, Infrastructure - 6,400 SF
Design
$2,000,000 CJ est. value
Newport, KY 41071

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Barrs Branch Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$900,000 CJ est. value
Alexandria, KY 41001

Bellevue and Dayton Joint Roadway Resurfacing
Infrastructure
Post-Bid
Dayton, KY 41074

Traffic Signal Pole Replacement
Infrastructure
Post-Bid
$70,000 CJ est. value
Newport, KY 41071

Resurfacing and Pavement Repair on Banklick Road- Phase 1
Infrastructure
Results
$238,000 est. value
Wilder, KY 41076

Asphalt Surface with Grade and Drain -Various Routes in Campbell County
Infrastructure
Results
KY

Gloria Terrell Drive Industrial Development
New Construction, Infrastructure - 350,000 SF
Pending Verification
$40,000,000 CJ est. value
Highland Heights, KY 41076

Gloria Terrell Drive Industrial Development
New Construction, Infrastructure - 350,000 SF
Pending Verification
$40,000,000 CJ est. value
Highland Heights, KY 41076

Asphalt Resurfacing - KY 1120
Infrastructure
Bidding
$4,000,000 CJ est. value
Newport, KY 41071

Campbell Call 108
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Alexandria, KY 41001

Highland Avenue/North Fort Thomas Avenue Streetscape
Infrastructure
Results
Fort Thomas, KY

Newport Multi-Residential
New Construction, Infrastructure
Pending Verification
$320,000,000 CJ est. value
Newport, KY 41071

Asphalt Resurfacing - Licking Pike (KY 915)
Infrastructure
Bidding
$4,000,000 CJ est. value
Alexandria, KY 41001

Last Updated 03/22/2023 05:37 AM
Project Title

Address Pavement Condition of I-471

Physical Address View project details and contacts
City, State (County) Newport, KY 41071   (Campbell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $5,780,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address Pavement Condition of I-471 Both Direction(S) From Milepoint 0 to Milepoint 4.75. Milepoints: From MP 0.000 To 4.750 Purpose and Need: Am-pavement (Int)(P) As of March 22, 2023, the project is in Conceptual status. Anticipated Letting Year is 2025. KYTC - Address Pavement Condition of I-471 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents