Similar Projects
Fairgrounds Restroom Facility
New Construction - 671 SF
Bidding
Ferron, UT

Construction of a Complete Restroom Building
Post-Bid
Hyde Park, UT 84318

Vault Toilets Zion National Park
New Construction
Post-Bid
$250,000 to $500,000 est. value

Z--(S) (660) Rest Room Restoration (Va-19-00020667)
Renovation - 5,019 SF
Results
$25,000 to $100,000 est. value
Salt Lake City, UT 84148

Independence Plat K Park - Restroom
Results
Bluffdale, UT 84065

Costco Dry Depot Additon #594
Addition - 56,700 SF
Construction
$4,300,000 est. value
Salt Lake City, UT 84104

Family History Library Main Level Restroom
Renovation - 27,263 SF
Construction
$300,000 est. value
Salt Lake City, UT 84150

Riverton Spa
New Construction - 6,479 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Riverton, UT 84065

Orem YSA 15th Stake Restroom Remodel
Renovation
Pending Verification
Orem, UT 84058

Beaver, Hampton Ford Ward Restroom Remodel
Renovation - 112 SF
Post-Bid
Logan, UT 84306

DFCM Construction-UDOT Bear Lake Rest Area Improvements
New Construction
Results
$850,000 est. value
Laketown, UT

DFCM Construction-Bear Lake SP Rendezvous Beach Restroom Improvement
Construction
$1,200,000 est. value
Laketown, UT 84038

Renovations and Improvements for Commercial Restrooms in One Building
Post-Bid
Price, UT

Fairgrounds Restrooms Project
Results
UT

Construction Of The Washington City Elephant Arch Trailhead Project
New Construction
Post-Bid
Washington, UT

Reported 05/21/2021 12:00 AM
Project Title

Pickleball Restroom Facilities Project 300 North - Steed Park

Physical Address View project details and contacts
City, State (County) Clearfield, UT 84015   (Davis County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $78,750
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; consisting of the following items of work: mobilization; obtaining all bonds and insurance, furnish and installing a sanitary sewer pipeline, manholes, curb and gutter, asphalt patching, and preparation of the restroom building, road base pad and installing all utility stubs to the center of the pad; all other appurtenant work.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents