Similar Projects
Sequoyah County Water System Improvements
Renovation, Infrastructure
Bidding
$2,000,000 est. value
Sallisaw, OK

Storage Tank Rehabilitation
Infrastructure
Bidding
$290,000 to $320,000 est. value
Wellston, OK

Plating Tank Repair
Post-Bid
Oklahoma City, OK

Construct Fire Protection Water Tank & System, Multi
New Construction, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK 73701

Water Tower Repair
Renovation
Results
El Reno, OK 73036

Kingfisher Disinfection Byproduct Reduction
Infrastructure
Results
Kingfisher, OK

MacArthur Elevated Storage Tank Rehabilitation
Infrastructure
Bidding
$1,350,000 est. value
Oklahoma City, OK 73127

Construct Fire Protection Water Storage Tank ?? EM to see if same as 2185108- Tanks sizes are different but project dates/site visits exactly SAME
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK

Underground Storage Tank Removal - JHCC
Infrastructure
Results
$482,925 est. value
Lexington, OK 73051

Storage Tank Rehabilitation
Infrastructure
Bidding
$230,000 to $250,000 est. value
Medford, OK

Water Tank Rehabilitation
Alteration
Post-Bid
$350,000 est. value
Krebs, OK

Repair Water Distribution System, Multi
Term Contract
Results
$10,000,000 est. value
Enid, OK 73705

D/B - Dustin Water Storage Tank Project
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Dustin, OK

2021 Water System Improvements - Mingo Water Storage Tank Rehabilitation
Infrastructure
Results
Bixby, OK

2021 WTP Clearwell
Infrastructure
Post-Bid
$1,100,000 est. value
Wewoka, OK

Last Updated 06/27/2022 11:22 AM
Project Title

Water Treatment Plant - FRP Brine Tank - 2154350 - City of Broken Arrow

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

WTP - FRP BRINE TANK Scope of the project or A detailed scope has not yet been determined As of June 25, 2022, this project is currently in the FY 2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents