Similar Projects
RFP D/B - SR 70 from Lorraine Road to Bourneside Boulevard, Manatee County
Infrastructure
Bidding
$71,669,608 CJ est. value
Bradenton, FL 34202

RFQ D/B - Install Additional Pump on OR Chilled Water Loop
Renovation
Bidding
$250,000 CJ est. value
West Palm Beach, FL 33410

Ackerman Vacuum Sewer Zones 1 And 2 - Plumbing Contract 2
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Port Charlotte, FL 33952

Green Cove Springs Library Plumbing Repairs
Renovation
Sub-Bidding
$130,000 CJ est. value
Green Cove Springs, FL 32043

Justice Center Tower Plumbing Replacement
Renovation
Post-Bid
Fort Myers, FL 33901

Cady Way Pool Filter
Alteration
Post-Bid
Winter Park, FL

Sources Sought - GSA, Region 4, Tampa, Design-Build Closed Loop Side Stream Filtration System, Water Source ACS and Piping Replacement
Results
$250,000 to $500,000 est. value
Tampa, FL

Commercial Plumbing Service and Fire Sprinkler Repair and Parts Services
Alteration
Results
Orlando, FL

Central District S-949A Electrical Distribution Building 2
New Construction, Infrastructure
Bidding
$139,644,880 CJ est. value
Key Biscayne, FL 33149

Hot Water Plumbing - 4th Floor At The Hyatt Regency Orlando International
Alteration
Post-Bid
Orlando, FL 32827

Continuing Plumbing Projects on a Task Authorization Basis
Term Contract, Alteration
Results
Kissimmee, FL

Sanitary Sewer Manhole Lining
Infrastructure
Bidding
$2,000,000 CJ est. value
Port Orange, FL 32129

RFQ D/B - Design-build Services for Southwest Water Reclamation Facility Second Cloth Media Filter
Renovation
Post-Bid
$4,390,000 CJ est. value
Bradenton, FL 34210

Plumbing Services for USF
Alteration
Results
Saint Petersburg, Sarasota, Tampa, FL 33620

Infusion Pumps - HHMC Daytona Campus
Infrastructure
Post-Bid
Daytona Beach, FL 32114

Last Updated 06/06/2023 02:06 AM
Project Title

Tavernier Breakwater Repair & Seaweed Barrier System Water Quality Improvement Project

Physical Address View project details and contacts
City, State (County) Key West Nas, FL 33040   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,641,684 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the project is to repair the breakwater and add the air curtain and seaweed prevention system. During Hurricane Irma, the storm surge toppled the boulders over the breakwater, which prior to the storm was providing a significant level of resiliency and storm surge protection to the homes. With the breakwater structure now severely damaged, this low-lying subdivision is subject to frequent and persistent flooding due to storms, astronomical high tides, and sea level rise. The repair activities are to be completed to return the breakwater structure to its previous condition prior to Hurricane Irma. In addition, the breakwater provided a barrier to the heavy loading of floating seaweed coming in from the ocean during the extreme heat of the summer that now clogs the canals, causing severe water quality problems, respiratory and health issues and environmental disaster. Repairing the breakwater and adding the air curtain and seaweed prevention system will help maintain better water quality in the canal systems near the breakwater, helping residents avoid respiratory distress and other health problems.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents