Similar Projects
Orangewood Lakes Water System Improvements Project
Infrastructure
Results
$510,000 est. value
New Port Richey, FL 34653

Neptune Meter R900 Automated Meter Reading System
Infrastructure
Post-Bid
Zephyrhills, FL

As Needed Underground Pipe Restoration Services
Term Contract
Results
FL

Fort King Water Main Extension
Infrastructure
Results
$1,900,000 est. value
Zephyrhills, FL 33544

As Needed Pipeline Maintenance (Poly Pig Cleaning) and Repair Services
Infrastructure
Results
New Port Richey, FL

Hilltop Drive Water Main Interconnect
Results
New Port Richey, FL 34654

Floramar Terrace Force Main Replacement
Infrastructure
Results
$892,901 est. value
New Port Richey, FL 34652

Curley Street Water Main Relocation
Results
$291,633 est. value
San Antonio, FL 33576

Reclaimed Water Pipeline Extension - Phase 1
Results
$1,500,000 est. value
Zephyrhills, FL

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Colonial Manor Water Main Replacement Phase 4
Results
New Port Richey, FL 34655

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Inspection of Fire Hydrants
Term Contract
Results
Less than $10,075 est. value
FL

As Needed Pipeline Repairs Contract
Term Contract
Results
Less than $1,000,000 est. value
FL

Last Updated 03/22/2022 12:20 AM
Project Title

Water Hydrant Inspection and Maintenance Services

Physical Address View project details and contacts
City, State (County) FL   (Pasco County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor that will perform inspections and maintenance service to all hydrants throughout the Pasco County Utilities System. Work consists of, but is not limited to, preventive services, testing, reporting, diagnosing problems, painting both hydrant and auxiliary hydrant valves and making specified field repairs to assure proper functioning for fire protection and other hydrant uses. The work will be performed under the general supervision of a County field supervisor.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents