Similar Projects
Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Joe Pool Lake Slide Repair
Design
$1,000,000 to $5,000,000 est. value
Dallas, TX 75249

Parmer Village Multi-Family Apartment - Building 1 and Sitework
New Construction
Post-Bid
Austin, TX 78753

Kemp Care Center Drainage Remediation and Foundation Repairs
Post-Bid
$500,000 to $2,250,000 est. value
Kemp, TX

Water - Sanitary Sewer - Drainage and Detention to Serve Newport Sections 6 and 10
Results
Newport, TX 76230

Construction of Water, Sanitary, Drainage and Paving Facilities for Audubon Creekside North Sec. 1
Results
$1,000,000 est. value
Montgomery, TX

Key School
New Construction
Construction
Fort Worth, TX 76119

Village 121 Site Work
New Construction
Construction
Plano, TX 75024

Olmos Park FY 2020-2021 Street and Drainage Maintenance
Post-Bid
Olmos Park, TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Habitat At Grove Apartments
New Construction, Infrastructure - 130,000 SF
Construction
$14,000,000 CJ est. value
McAllen, TX 78501

Tannery Lake Dam Reconstruction
Post-Bid
Denton, TX

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

On-Call Services for Repairs of Embankments and Grades
Post-Bid
Conroe, TX

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

Last Updated 08/31/2022 10:35 AM
Project Title

Proposed Construction of Town Center Pond

Physical Address View project details and contacts
City, State (County) Early, TX 76802   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $396,363 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Each submission must be accompanied by a certified check of the submitter, or a bid bond executed by the submitter as principal and having as surety thereon a surety company approved by the City in the amount of 5% of the submission. The Surety's Power of Attorney must accompany the bid bond. The bid bond and surety's Power of Attorney must both carry the same date which is no earlier than three (3) days prior to the scheduled bid opening date. Checks will be returned to all except the three lowest bidders within three days after the opening of bids. The remaining checks will be returned promptly after the City and the selected bidder have executed the contract. If no award has been made within ninety (90) days after the date of the opening of bids, a bidder may demand that the security submitted be returned so long as said bidder has not been notified of the acceptance of his bid. If the selected bidder refuses or fails to execute and deliver the contract and bonds (payment and/or performance) required within 10 days after receiving notice of the acceptance of his bid, the bid security shall forfeit to the City as liquidated damages for such failure or refusal. A Bid Bond form can be found in the Appendices. The Contractor further agrees to pay, as liquidated damages, the sum of $1000.00 for each WORKING day

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents