Similar Projects
Dr. John Hole Elementary School Boiler Replacement
Bidding
$200,000 est. value
Centerville, OH 45459

Purchase of One (1) SCBA Compressor
Post-Bid
Dayton, OH

Fawcett Exhaust Fan
Post-Bid
Less than $470,000 est. value
Dayton, OH

HVAC Maintenance Services
Results

BAS Update Project Phase I Central Storage Facility
Results
Less than $53,241 est. value
Dayton, OH

HVAC Improvements and Upgrades
Post-Bid

Central Storage Chiller Installation and BAS Upgrade 2020
Results
Dayton, OH 45404

Hvac Equipment & Related Services (Air-Cooled Chiller Unit) For The Bas Update Project Phase I, Central Storage Facility (Equipment Pre-Purchase)
Post-Bid
Dayton, OH 45390

Ponitz Career Center HVAC and BAS Upgrades 2020
Results
Dayton, OH 45402

Oelman Exhaust Fan Replacement
Post-Bid
Less than $1,092,000 est. value
Dayton, OH 45435

Portable Light Plants and Tow-Behind Air Compressors
Term Contract
Results

Replace AC Unit Building 13 Noc Sinclair Community College
Post-Bid
Less than $225,000 est. value
Dayton, OH

Z2DA--Replace Pharmacy Air Handler Unit Project 552-20-505 Dayton VA Medical Center
Results
$250,000 to $500,000 est. value
Dayton, OH 45428

HVAC Guaranteed Maintenance PM and Service
Post-Bid
Dayton, OH 45390

HVAC Services
Results
Dayton, OH

Last Updated 09/11/2020 08:55 AM
Project Title

Safety Building Chiller Replacement

Physical Address View project details and contacts
City, State (County) Dayton, OH   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $382,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of renovations to the building chilled water plant. The existing water-cooled chiller and pumping system in the basement will be demolished. A new, air-cooled chiller will be installed at the west end of the building on grade. New chilled water pumps, hydronic accessories, variable frequency drives, and a glycol-to-water heat exchanger will be installed in the basement mechanical room

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents