Similar Projects
Pump and Motor Repair Services
Infrastructure
Bidding
Monroe, NC

Pump Replacements at the Chiller Plant
Alteration
Bidding
Raleigh, NC 27603

Burton Park Castle Hayne Monitoring Wells
Post-Bid
Jacksonville, NC 28541

Ostwalt Amity Area Water System Expansion Contract II - Well Buildings
Post-Bid
NC

Contract III - 2020 USDA Well Building Improvements
Results
Red Springs, NC 28377

Construction of 2 New Water Supply Wells Serving
Results
Less than $392,000 est. value
Wallace, NC 28466

2022 Black Creek Wells Discharge Pipe Replacement Project
Alteration
Bidding
Jacksonville, Richlands, NC 28574

Lower Rocky River Pump Station Screening and Influent Gate Replacement
Post-Bid
Harrisburg, NC 28075

16" PTO Pump-NCFS
Results
Raleigh, NC 27699

Lake Norman Regional Pump Station Wet Well Rehabilitation and Bar Screen
Renovation, Alteration
Bidding
Mooresville, NC 28117

Turbo Molecular Vacuum Pump
Post-Bid
Raleigh, NC 27695

Pendergrass Chlorine Booster Pump System
Results
Sanford, NC 27330

Well 11 Motor Replacement
Post-Bid
Kinston, NC

Repair, Overhaul, and Rebuild of Stokes Mechanical Pump
Results
Cherry Point, NC

Replace Pumps and Controls B3881
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC 28533

Last Updated 01/05/2022 02:16 PM
Project Title

2022 Dixon Well 9 Pump and Well Inspection Project

Physical Address View project details and contacts
City, State (County) Holly Ridge, NC 28445   (Onslow County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and evaluate the existing turbine pump, shaft, motor and appurtenances; clean and visually inspect the existing well casing and screens; document well configuration/condition; and provide recommendations for repair of any deficiencies discovered. All work is to be performed at Dixon Well 9, located at 123 Folkstone Rd, Holly Ridge, NC 28445.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents