Similar Projects
Fleet - HD Cooling Systems and Radiator Core Replacement
Alteration
Bidding
Columbus, OH

Dayton International Airport-Airfield Lighting Standby Emergency Generator and Regulators Replacement
Alteration
Bidding
Dayton, OH 45426

Electrical Meterbase Replacements
Post-Bid
Manchester, OH 45144

WPC Electric Distribution Voltage Upgrade Equipment
Post-Bid
Bowling Green, OH

Ironton Ranger District Lighting Wayne National Forest
Results
Less than $25,000 est. value
Arabia, Pedro, OH 45659

Dave Johnston Tap-Sidney Reconductor
Results
$10,000,000 est. value
Sidney, OH

2022 WPC Electric Distribution Voltage Upgrade Equipment
Alteration
Bidding
Bowling Green, OH

Electric Department Materials, Supplies and Services
Post-Bid
Cuyahoga Falls, OH

DOP - 2020 - ATC Retrofit Package for G and W Switches
Results
Columbus, OH

2022 Big Island Water Works Plant Variable Frequency Drives Replacement Project
Alteration
Bidding
$540,000 est. value
Sandusky, OH

Purchase of Distribution Transformers
Post-Bid
Cleveland, OH

910 Dublin Road Standby Power Improvements
Results
Less than $154,000 est. value
Columbus, OH 43215

Testing and Maintenance Electrical Switchgear and Substations
Term Contract
Bidding
Dayton, OH 45428

69 kV Main Substation - Major Equipment Procurement
Post-Bid
Grafton, OH

Capital Maintenance and Repairs of City Facilities Electrical
Results
$141,880 est. value
Cleveland, OH

Reported 03/26/2022 12:00 AM
Project Title

UPS Preventive and Emergency Maintenance BPA

Physical Address View project details and contacts
City, State (County) Vienna, OH 44473   (Trumbull County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Annual preventive maintenance service and unscheduled emergency maintenance/repair of five (5) uninterruptible power systems. In the event of an emergency, a technician must be on site within four (4) hours. The technicians must have the ability to work on the Liebert equipment.

Details

Division 26 - Electrical, Battery Equipment, Static Uninterruptible Power Supply.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents