Similar Projects
DS-56 Banana River Tank Improvements - CP-WS-17-BR - City of Cocoa
Infrastructure
Conception
$675,000 CJ est. value
Cocoa, FL 32924

WT-63 Replacement of Dyal Finished Water Steel GST - WS18RD - City of Cocoa
Infrastructure
Conception
$5,000,000 CJ est. value
Cocoa, FL 32924

Mosswood Townhomes Subdivision
New Construction, Infrastructure
Design
$15,652,160 CJ est. value
Melbourne, FL 32935

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Starbucks / Melbourne
Demolition, New Construction, Infrastructure - 2,503 SF
Post-Bid
$762,000 CJ est. value
Melbourne, FL 32901

RFQ Contractor - Construct New Antenna Tower for Continued Launch Support From the Eastern Range and Demolish Deteriorated Facility
Demolition, Infrastructure
Post-Bid
$500,000 CJ est. value
Canaveral As, FL 32925

Silicone Joint Sealer
Infrastructure
Results

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Results

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

Eau Gallie Office Park, Phase 6 - Makoto's Addition
Addition, Demolition, Renovation, Infrastructure - 3,913 SF
Pending Verification
$1,000,000 CJ est. value
Melbourne, FL 32934

SpaceX Operations Area / Kennedy Space Center
New Construction, Infrastructure - 480,000 SF
Pending Verification
$258,000,000 CJ est. value
Titusville, FL 32780

Lee Wenner Park Renovation - CD18LW - City of Cocoa
Renovation, Infrastructure
Conception
$9,340,000 CJ est. value
Cocoa, FL 32922

Westin Hotel & Resort Cocoa Beach
New Construction, Infrastructure - 90,000 SF
Design
$250,000,000 CJ est. value
Cocoa Beach, FL 32931

Oklahoma Stormwater Improvements - Brevard County
Infrastructure
Post-Bid
$700,000 CJ est. value
Rockledge, FL 32955

Last Updated 10/03/2023 03:05 AM
Project Title

New Refuge Visitor & Community Conservation Education Center

Physical Address View project details and contacts
City, State (County) Titusville, FL 32796   (Brevard County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

MERRITT ISALND NATIONAL WILDLIFE REFUGE- TITUSVILLE, FL. Construct a New Visitor & Community Conservation Education Center at Merritt Island National Wildlife Refuge in Titusville, Florida. This project has already been awarded to our firm and is currently in 95% design phase. This project requires multiple scopes/disciplines to include but not limited to the following: Site Work and Utilities, Concrete, Masonry (CMU), Miscellaneous Metals, Division 6, Roofing, Fiber-Cement Siding, Doors/Hardware, Windows, Tiling, Painting, Drywall, Division 10 and 12 Specialties, Mechanical, Electrical, Comm, and Security.

Details

1 Story Above Grade, 8,100 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents