Similar Projects
Pipes, Valves, and Fittings
Term Contract
Design
Detroit, MI 48226

RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

As-Needed Water Main Break Repairs
Term Contract
Sub-Bidding
Plymouth, MI 48170

Detroit Public Schools Community District 2022 Capital Improvements Series 1
Renovation
Sub-Bidding
$24,000,000 CJ est. value
Detroit, MI 48202

Community Homeworks - Vendors for Service Term Contracts
Term Contract
Post-Bid

Pest Control/Bed Bug Treatment Services
Post-Bid
Inkster, MI

Brown and Miller Elementary Schools Phase 3
Results
New Boston, MI 48164

2021 Central Office Building Renovation
Renovation
Results
Livonia, MI 48150

Aggregate Slag
Term Contract
Sub-Bidding
Detroit, MI 48226

Pet Carcass Disposal Services for 2 Years
Term Contract, Alteration
Post-Bid
Detroit, MI

Remodeling Services for the Drew Academy
Renovation
Results
Ecorse, MI 48229

Ductile Iron Pipe - Various Sixes
Term Contract
Sub-Bidding
Detroit, MI 48226

Clean Energy/Renewable Firms
Alteration
Post-Bid
Detroit, MI

On-Call Grading and Overburden Removal Services
Term Contract
Results
Detroit, MI

Cleaning of Catch Basins / Cleaning and Video Inspection of Siphons
Term Contract
Sub-Bidding
Dearborn, MI 48126

Last Updated 08/12/2022 09:33 AM
Project Title

Detroit Public Schools Community District 2022 Capital Improvements Projects - Series 2

Physical Address View project details and contacts
City, State (County) Detroit, MI 48226   (Wayne County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Middle/Senior High School, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $24,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

All proposals must be accompanied by a completed and notarized Iran Economic Sanctions Act Certificate and Familial Relationship Sworn Statement. All contractors bidding on work must be bondable and must include in their bid the cost for furnishing a Co-Obligee Labor and Material Payment Bond and a Co-Obligee Performance Bond. The required bonding forms have been included as Attachment H to this project manual. All questions are to be directed to the Construction Manager. No direct contact with the Owner or Architect is requested. All questions must be in writing and submitted via website, no later than August 1, 2022 at 12:00pm (noon). Each Proposal shall be accompanied by a bid bond made payable to Brinker-Christman, a Joint Venture in an amount not less than five percent (5%) of the base bid as a bid security. If bidders do not wish to furnish a bid bond, bid security may also be submitted in the form of certified check, cashiers' check, or money order The Bid Security of Bidders under consideration will be returned immediately after award of contracts. The amount of the guarantee shall be forfeited to Brinker-Christman, a Joint Venture if the successful Bidder fails to enter into a contract and furnish required bonds and insurance within 30 days after award of contracts. All proposals submitted shall remain valid for a period of ninety (90) days after the bid date. Brinker-Christman, a Joint Venture reserves the right to waive any irregularities, reject any or all proposals, or accept any proposal, which, in their opinion, will serve their best interest. The deadline for questions is August 9, 2022 at 5:00 p.m.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents