Similar Projects
Mill and Overlay East Avenue - City of Ketchum
Infrastructure
Conception
$600,000 CJ est. value
Ketchum, ID 83340

Mill and Overlay East Avenue - City of Ketchum
Infrastructure
Conception
$600,000 CJ est. value
Ketchum, ID 83340

4th and Main Mixed-Use Building / Ketchum
New Construction, Infrastructure - 22,000 SF
Design
$6,500,000 CJ est. value
Ketchum, ID 83340

4th and Main Mixed-Use Building / Ketchum
New Construction, Infrastructure - 22,000 SF
Design
$6,500,000 CJ est. value
Ketchum, ID 83340

Ketchum Sidewalks Infill 2022
Infrastructure
Post-Bid
$400,000 est. value
Ketchum, ID

Indian Creek Road Reconstruction
Infrastructure
Post-Bid
$300,000 est. value
Hailey, ID 83333

FY23, SH-34 D5 Guardrail Replacement
Infrastructure
Results
$1,100,000 CJ est. value
Preston, ID 83263

FY23, SH-34 D5 Guardrail Replacement
Infrastructure
Results
$1,100,000 CJ est. value
Preston, ID 83263

Sun Valley Luxury Car Rental
New Construction, Infrastructure - 18,544 SF
Construction
$4,300,000 CJ est. value
Hailey, ID 83333

1551 Aviation Drive Mixed Use
New Construction, Infrastructure - 92,358 SF
Pending Verification
$12,000,000 CJ est. value
Hailey, ID 83333

40 McKercher Boulevard Multi-Residential
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Hailey, ID 83333

Warm Springs Lift Area Sidewalk Gutter Roadway (Engineering) - City of Ketchum
Infrastructure
Conception
$250,000 CJ est. value
Ketchum, ID 83340

The Perry Building Mixed-Use
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Ketchum, ID 83340

RFP Engineering - Concept Development for Pedestrian and Bicycle Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Ketchum, ID 83340

Constructing a Signal on Sh-75, Mp 121
Infrastructure
Results
$724,532 CJ est. value
Hailey, ID 83333

Last Updated 07/05/2023 08:01 PM
Project Title

Ketchum Sidewalks Infill 2023 5th Street

Physical Address View project details and contacts
City, State (County) Ketchum, ID 83340   (Blaine County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,321,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed or electronic bids for the construction of the KETCHUM SIDEWALKS INFILL 2023 - 5TH STREET project addressed to "City of Ketchum" will be received. DESCRIPTION OF WORK: The proposed project consists of removal of landscape retaining wall, installation of curb, gutter, sidewalk, asphalt patching; ADA-compliant pedestrian ramps, structural and landscape retaining walls, site lighting, storm drainage, pavement markings, and other appurtenances for the following sidewalk infill location in the Ketchum, Idaho downtown core: South side of 5th Street from Leadville Avenue to the first alley east of Main Street. A BID must be submitted on the prescribed form and shall be accompanied by Bid Security in the form of a certified cashier's check, or a corporate bid bond payable to the City of Ketchum Idaho, in the amount of five percent (5%) of the total bid amount. The successful Bidder will be required to provide Performance and Payment Bonds, each in the amount of not less than one-hundred percent (100%) of the contract price. OTHER REQUIREMENTS: Bidders and their subcontractors shall provide proof of a Public Works Contractors License for the State of Idaho in effect at the time of BID submittal. Bidders will submit a list of all Subcontractors with their BID. All Subcontractors shall also provide proof of a Public Works Contractor's License for the State of Idaho in effect at the time of BID submittal. The attention of Bidders is directed to the applicable local, state, and federal requirements regarding conditions of employment to be observed. BID DELIVERY: Two methods of delivery will be accepted, electronic or hardcopy. For electronic delivery: The bid shall be emailed to Trent Donat at tdonat@ketchumidaho.org in PDF format. Electronic bids shall be submitted in one single PDF file with the file name and subject line of: "KetchumSidewalksInfill2023_[contractor name]_[date].pdf." "BID ATTACHED: KETCHUM SIDEWALKS INFILL 2023 - 5TH STREET - [contractor name]" For hardcopies delivery: The bid shall be sealed and addressed to the City of Ketchum and mailed to P.O. Box 2315, Ketchum Idaho, 83340, or delivered to 191 5th Street West. Ketchum, Idaho, 83340. The envelope shall be plainly marked in the upper left-hand corner with the name and address of the bidder and shall bear the words: "Bid For [Project title] [date and hour of opening of bids]. BID DELIVERY: Two methods of delivery will be accepted, electronic or hardcopy. For electronic delivery: The bid shall be emailed to Trent Donat at tdonat@ketchumidaho.org in PDF format. Electronic bids shall be submitted in one single PDF file with the file name and subject line of: "KetchumSidewalksInfill2023_[contractor name]_[date].pdf." "BID ATTACHED: KETCHUM SIDEWALKS INFILL 2023 - 5TH STREET - [contractor name]" For hardcopies delivery: The bid shall be sealed and addressed to the City of Ketchum and mailed to P.O. Box 2315, Ketchum Idaho, 83340, or delivered to 191 5th Street West. Ketchum, Idaho, 83340. The envelope shall be plainly marked in the upper left-hand corner with the name and address of the bidder and shall bear the words: "Bid For [Project title] [date and hour of opening of bids]. PROJECT ADMINISTRATION: Questions regarding this project prior to the bid opening shall be directed to the Owner's Project Manager: Sherri Newland, PE, (208) 861-7593, snewland@sandcassociates.com. The City of Ketchum reserves the right to waive any informalities or reject any or all bids, if in the best interest of the City of Ketchum. the NOTICE TO PROCEED for the work shall be issued by July 31, 2023 by the Owner SUBSTANTIAL COMPLETION must be issued by October 13, 2023, with FINAL COMPLETION by October 27, 2023, for all work locations, unless other extended by agreement between the Successful Bidder and the Owner

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents