Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

NCSU - HVAC Renovation Matsumoto Wing - Brooks Hall
Alteration
Bidding
$565,000 est. value
Raleigh, NC 27605

Gas Water Heater and HVAC Venting Replacements
Alteration
Bidding
Raleigh, NC 27604

Orange County Motor Pool HVAC Installation
Post-Bid
Hillsborough, NC 27278

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

EMD Facility HVAC Upgrades
Results
Wilmington, NC

DPS Burton Elementary School Boiler Replacement
Alteration
Bidding
Durham, NC 27701

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Air Filters
Alteration
Bidding
NC

Request for Proposal for HVAC and Electrical Design and Consulting Services Andrew Carnegie Library
Post-Bid
Salisbury, NC 28144

Nature Exploration Center (NEC) Building HVAC Control System Replacement
- 200,000 SF
Results
Less than $1,090,000 est. value
Raleigh, NC 27601

HVAC Bid Project
Alteration
Bidding
Morganton, NC

Reported 01/21/2022 12:00 AM
Project Title

Havelock High School Gym HVAC Renovations

Physical Address View project details and contacts
City, State (County) Havelock, NC 28532   (Craven County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Havelock High School Gym HVAC project. The project location is at 101 Webb Blvd., Havelock NC 28532. The project consists of new mechanical equipment for the gymnasium and the replacement of other equipment. The new gymnasium units will be placed on the roof and some structural work will be required prior to their placement. These units will be ducted and penetrate the metal roofing on the existing high roof area. Once inside ducting will be as noted and routed as needed to properly cool the space.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents