Similar Projects
Last Updated | 09/19/2023 01:55 PM |
Project Title | RFP- Construction Manager At Risk Northwest Service Area Ground Storage Tank and Booster Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Perry, GA 31069 (Houston County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 09/12/2023 The City of Perry (City) is seeking Proposals from qualified firms interested in providing Construction Manager at Risk (CMAR) services for a project known as the NORTHWEST SERVICE AREA GROUND STORAGE TANK AND BOOSTER PUMP STATION in Perry, Georgia (the Project). The project is located at the northwest corner of Georgia Hwy 341 and the Perry Bypass on the future Jack Links Processing Facility site. This facility is currently under construction. The Project includes material procurement and construction of a new 1,000,000 gallon ground storage tank and booster pump station that will include various pump sizes for fire flow and other system demands. The work includes as booster pump building, electrical and controls components, site work and grading, water mains to feed the tank and distribute water discharged from the booster pump station, and various interconnections with existing water mains. The CMAR will also be responsible for providing structural design for the tank and booster pump building that is stamped by a professional structural engineer in the State of Georgia. The CMAR will provide Preconstruction and Construction Phase Services in collaboration with the Engineer and Owner. The Project scope, design standards and performance requirements are described in more detail in Attachment D (Design Documents and Specifications). The Project scope, design standards and performance requirements are described in more detail in Attachment D (Design Documents and Specifications). The total budget for preconstruction and construction CMAR services for the proposed improvements is currently $5,000,000. The Project will be funded using local funds. Question Deadline 09/12/2023 GWES will act as the Owner Contact and shall administer the RFP process. All communications shall be submitted in writing, by email, and shall specifically reference this RFP. All questions or comments should be directed to the Owner Contact as follows: Burke Murph, PE GWES 733 Carroll Street, Perry, Georgia 31069 Email: burke.murph@gwesllc.com |
||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |