Similar Projects
As-Needed Roof Repairs for 3 Years
Term Contract
Sub-Bidding
$90,000 CJ est. value
Pittsfield, MA 01201

As-Needed Plumbing Repairs for 3 Years
Term Contract
Sub-Bidding
$50,000 CJ est. value
Pittsfield, MA 01201

Action Energy Services Weatherization Assistance Program
Alteration
Post-Bid

RFP for Accounting Services
Term Contract
Post-Bid

Pavement Preservation Project/Various Locations
Term Contract
Results
$550,000 CJ est. value
Arlington, MA 02476

CCTV Services and Cleaning of Sewer and Drain Mains
Term Contract
Sub-Bidding
Pittsfield, MA 01201

Emergency Contractor Work
Term Contract
Post-Bid
Lee, MA 01238

The Town Hall Improvements Project to Replace Carpets, Install Engergy Efficient Windows, Power Wash, Paint Interior and Exterior of Town Hall
Alteration
Post-Bid
$100,000 est. value
Lanesborough, MA 01237

Removal and Proper Disposal of Liquid Sludge Generated by the Wastewater Treatment Plant for the Fiscal Years 2023 - 2025
Term Contract
Post-Bid
Stockbridge, MA 01262

Maintenance Projects and Emergency Repair Work
Term Contract
Post-Bid
$80,000 CJ est. value
Great Barrington, MA 01230

Tree Management Services for FY 2023
Term Contract
Post-Bid
Lanesborough, MA 01237

Winter Road Salt
Term Contract
Post-Bid
Great Barrington, MA 01230

Low-income Heating System Repair and Replacement Program
Term Contract, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Pittsfield, MA 01201

Winter Seasons 2022 - 2023
Term Contract
Post-Bid
Great Barrington, MA 01230

Snowplowing
Term Contract
Post-Bid
Great Barrington, MA 01230

Last Updated 07/12/2023 12:33 PM
Project Title

Represent the District During the Feasibility Study and Schematic Design Phases

Physical Address View project details and contacts
City, State (County) Stockbridge, MA 01262   (Berkshire County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $125,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Requesting the services of an Owner's Project Manager to represent the District during the feasibility study and schematic design phases of the project initially. The feasibility study and schematic design phases are expected to take 20 - 24 months to complete. Estimated Construction Cost $75,000,000- $125,000,000 Contact Information Name Steven Soule Phone 413-298-4017 x23 Fax 413-298-4642 Email Address steven.soule@bhrsd.org Notify email address listed when final publish date assigned. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents