Similar Projects
Pavement Resurfacing Including Sidewalk Ramps
Infrastructure
Bidding
NY

Orange Street and Saxton Street Rehabilitation Project
Infrastructure
Bidding
$1,422,400 est. value
Rochester, NY 14611

Hazardous Sidewalk Replacement Program Northwest Quadrant Contract 2021 Phase 2
Results
Less than $1,120,000 est. value
Rochester, NY

Public Safety Building Parking Loop Modifications
Infrastructure
Results
Rochester, NY 14614

Spring Lake Trail
Results
Fairport, NY 14450

Monroe Community Hospital Sidewalk Replacement
Results
Rochester, NY 14620

Gates Fire District - Station 1 and 3 Parking Improvements Project
Results
Rochester, NY

Eastman Trail - Phase I
Alteration
Results
$960,000 est. value
Rochester, NY

State Street Reconstruction
Infrastructure
Bidding
$7,360,000 est. value
Rochester, NY 14611

Pittsford Fire Station Rear Parking Lot
Results
Pittsford, NY 14534

Greece Public Library - Parking Lot Expansion
Results
Greece, NY 14612

Replacement of Curbs, Sidewalk and Parking Lot Paving
Post-Bid
$250,000 to $500,000 est. value
Rochester, NY

Lena Gantt Site Improvements
Results
Rochester, NY 14611

Pedestrian Safety Action Plan
Results
$1,538,400 est. value
Rochester, NY

Reconstruct New Campus Drive and Cooper Hall Drop Off at SUNY Brockport
Results
$5,000,000 to $10,000,000 est. value
Brockport, NY 14420

Last Updated 10/22/2021 05:17 AM
Project Title

Multi Use Trail from Ridgeway Avenue to Route 104

Physical Address View project details and contacts
City, State (County) Greece, Rochester, NY 14611   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route 390 Multi-Use Trail along Latona Road from Ridgeway Ave to West Ridge Road in the towns of Gates and Greece, and in the City of Rochester, Monroe County. This project will develop a 2.5 mile long non-motorized, accessible paved trail that will connect the existing Canalway Trail on the south to the existing Route 390 Bike path at Ridge Road (Route 104) on the north.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents