Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

SR 3/SR 304 to SR 303 - Paving
Infrastructure
Design
$2,454,000 est. value
Silverdale, WA

Temporary Front Street One-Way Detour for Raised Crosswalk Installation
Infrastructure
Design
$400,000 CJ est. value
Poulsbo, WA 98370

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

RFQ D/B - I-405, Northeast 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Rhonda Holland Septic System
Infrastructure
Bidding
$100,000 CJ est. value
Bremerton, WA 98311

Well Drilling
Infrastructure
Post-Bid
Bainbridge Island, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Repair Retaining Wall, B448, PSNS
Infrastructure
Bidding
$300,000 CJ est. value
Bremerton, WA 98314

2022 Preservation Project - Glenwood Rd & Holly Road
Infrastructure
Post-Bid
$900,000 to $1,250,000 est. value
WA

Last Updated 08/22/2022 07:01 PM
Project Title

East 11th Street and Perry Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98310   (Kitsap County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,575,580 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

East 11th Street and Perry Avenue Reconstruction Engineer's Estimate range for this project is $5.2 to $5.8 million. This Contract provides for the improvement of East 11th Street and Perry Avenue within the neighborhood of Manette in Bremerton, Washington. The WORK to be completed under this Contract consists of full roadway and sidewalk reconstruction for approximately three thousand feet of East 11th Street and Perry Avenue. Roadway and sidewalk reconstruction, water quality improvements, drainage system reconstruction, water system work, bike lane installation, pedestrian illumination improvements and other minor work are within the project scope.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents