Similar Projects
Senior Living - Mixed Use Development
New Construction - 3,736 SF
Conception
$25,436,089 est. value
Sun Prairie, WI

Garver Office/Olbrich Cottage Repointing
Demolition
Conception
Madison, WI 53704

Quarra Stone Company Headquarters
New Construction
Design
Sun Prairie, WI 53590

Partial Demolition For Constructing An Addition Containing Eight Commercial Spaces And Eight Apartments
Addition, Demolition - 5,200 SF
Design
Madison, WI 53703

Add/Alter (ADAL) B510 Base Warehouse and Supply
Renovation, Addition, Alteration - 33,300 SF
Bidding
$5,000,000 to $10,000,000 est. value
Madison, WI 53704

Add/Alter (ADAL) B510 Base Warehouse and Supply
Renovation, Addition, Alteration - 33,300 SF
Bidding
$5,000,000 to $10,000,000 est. value
Madison, WI 53704

Motor Vehicle Storage Building - MEP
New Construction
Post-Bid
$1,400,000 est. value
Madison, WI 53704

Kettle Park West Shopping Center
New Construction, Renovation - 8,425 SF
Post-Bid
Stoughton, WI 53589

115th Fighter Wing Temporary Modular/Mobile Office Facilities
Results
Madison, WI 53704

Highway Satellite Building - Albion
Results
WI 53534

D1 Training
Renovation - 5,627 SF
Construction
Madison, WI 53719

Extra Space Climate Controlled Self Storage Facility
Renovation, Addition - 217,305 SF
Construction
$10,000,000 CJ est. value
Middleton, WI 53562

Construct Medical Readiness Facility
New Construction - 22,050 SF
Design
$10,000,000 to $25,000,000 est. value
Madison, WI

West Badger Road Salt Barn
New Construction
Bidding
$2,010,000 est. value
Monona, WI 53713

Morgan Stanley WM
Renovation - 27,765 SF
Post-Bid
Middleton, WI

Reported 05/12/2022 12:00 AM
Project Title

South Central Library System - New Office/Warehouse

Physical Address View project details and contacts
City, State (County) Madison, WI 53718   (Dane County)
Category(s) Commercial
Sub-Category(s) Office, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of the following divisions of work: Earthwork and Utilities, Hot Mix Asphalt Paving, Landscaping and Seeding, Chain Link Fence Gates, Site Cast-in-Place Concrete, Building Cast-inPlace Concrete, Masonry, Carpentry, Building Insulation, Metal Siding and Soffit, Aluminum Storefront and Windows, Sectional Doors, Drywall Assemblies, Flooring, Concrete Floor Finish, Lockers, Folding Panel Partition, Cabinets & Millwork, Acoustical Panel Ceiling, Painting and Finishing, Metal Building Systems, Fire Protection Sprinkler, Plumbing, HVAC, Electrical, Signage, and Data Center

Details

,, 65,800 SF - Office, 32,900 SF New Construction, Warehouse/Storage, 32,900 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents