Similar Projects
Hickory Grove and Red Hollow Roof Renovation Project
Alteration
Post-Bid
Birmingham, AL 35217

Roof Replacements and Repairs of Various Schools
Alteration
Post-Bid
Birmingham, Hoover, AL 35244

Mccoy Building Roof Renovation
Alteration
Results
Birmingham, AL

Hemphill Roof and Structural Repairs
Alteration
Results
Birmingham, AL 35211

Shades Valley Complex Re-Roofing and Village Creek Renovations
New Construction, Renovation, Demolition, Alteration
Post-Bid
$2,750,000 est. value
Birmingham, AL

UAB Center for Biophysical Sciences and Engineering Roof Replacement
Renovation
Results
$1,878,400 CJ est. value
Birmingham, AL 35205

CRGP Housing Rehabilitation - Roof Only
Alteration
Post-Bid
$80,000 est. value
Birmingham, AL

Partial Reroofing for Tarrant Elementary School and Tarrant City Board of Education Building Architect
Alteration
Post-Bid
$300,000 est. value
Birmingham, AL

Replace Athletic Gym Floors
Alteration
Post-Bid
$200,000 est. value
Birmingham, AL

Fairfield Community Center Project
Renovation - 30,464 SF
Post-Bid
$300,000 CJ est. value
Fairfield, AL 35064

Roof Replacement or Repair
Renovation
Post-Bid
$300,000 CJ est. value
Birmingham, AL 35233

Simmons Middle School Partial Roof Replacement
Renovation
Post-Bid
$200,000 CJ est. value
Hoover, AL 35226

UAB Highlands Roof Repair
Renovation - 16,250 SF
Post-Bid
$100,000 CJ est. value
Birmingham, AL 35205

Roofing Construction
Renovation
Post-Bid
$300,000 CJ est. value
Birmingham, AL 35221

Roofing Construction Bids Bessemer B Building
Renovation
Post-Bid
$400,000 CJ est. value
Bessemer, AL 35020

Last Updated 06/13/2023 04:04 PM
Project Title

Birmingham Police Headquarters Roof Replacement

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35203   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $386,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

"Under the Alabama State Code,Section 39-2-4,as amended by Act #2017-279,it is" "required for any contract exceeding $50,000 that the Bidder submit with his bid, either a cashier's check, drawn on an Alabama bank,or a bid bond, executed by a surety authorized and qualified to make bonds in Alabama, payable to the City of Birmingham. in an amount {subject to a maximum of $10,000.00) equal to five percent (5%) of the bid. In order for a bid to be considered,it must be accompanied by an acceptable bid bond or cashier's check." "Any bid submitted for an amount of $50,000 or more,the bidder must be a licensed" general contractor in the State of Alabama in accordance with Section 34-8. of the Alabama State Code. Contractor's license number shall appear on the outside of the envelope used to submit bid. A Performance Bond in the amount of 100% of the contract amount and a Statutory "Labor and Material Payment Bond in the amount of 100% of the contract amount will be required from the successful bidder at tthe signing of the contract. Also, proof of insurance will be required when the contract is signed. The City will review bonds and insurance and execute the contract within twenty {20) days unless the successful contractor agrees to an extension in writing." Remove all existing roof down to the existing concrete deck. Remove all roofing from the backside of existing parapet. Install a complete single ply PVC roof system including membrane, flashing, and other components in accordance with roofing Manufacturer's specifications. Refer to Project Manual and drawings for the full expanded scope of work. The Work will generally consist of the installation of Birmingham Police Headquarters Roof Replacement, for the City of Birmingham located at 1700 1st Avenue North, Birmingham, AL 35203. All Work as defined in the Specifications. The following Scope of Work shall not be construed as dictating the Contractor's means and methods of work, nor to dictate Project scheduling or phasing. It shall be the Contractor's responsibility to properly coordinate all trades and schedules of work as required to provide a complete, functioning system in compliance with all applicable codes, standards, and regulatory requirements.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents