Similar Projects
On-Call Plumbing Services
Term Contract
Bidding
Less than $50,000 est. value
Fitchburg, MA

SUST - Low Flow Toilets, Lakeview Manor 200-1
Alteration
Bidding
$101,700 est. value
Weymouth, MA 02189

Adamsdale Well Pump Station with a New Building
Alteration
Sub-Bidding
$3,700,000 est. value
North Attleborough, MA

Waste Stack Replacement and Water Riser Replacement
Alteration
Sub-Bidding
$1,260,000 est. value
Worcester, MA 01605

Doris Bunte RAD Conversion - Filed Sub Bids
Post-Bid
Boston, MA

On Call Plumbing Contractor
Term Contract
Post-Bid
Less than $100,000 est. value
Marshfield, MA

New DPW Garage - Filed Sub Bids
Results
$800,000 est. value
Wilbraham, MA 01095

Student Center Plumbing Relocation Project
Results
$76,600 est. value
Brockton, MA 02302

Repairs to the Spray Features, Including Removal of 2 Current Spray Heads Set
Alteration
Bidding
$15,280 est. value
Boston, MA

Miscellaneous Plumbing Services
Post-Bid
Less than $50,000 est. value
Foxborough, MA

Plumbing Fixture Upgrades at Washington Elementary School
Results
Less than $50,000 est. value
Springfield, MA 01103

Waste Stack Replacement and Water Riser Replacement - General Bid
Alteration
Bidding
$1,260,000 est. value
Worcester, MA 01605

Plumbing and Gas Routine Work
Post-Bid
Hadley, MA

FY 2021 Plumbing Services
Results
Less than $150,000 est. value
Brockton, MA

On-Call Tradesperson and Repair Services
Post-Bid
Plymouth, MA

Last Updated 11/03/2021 09:13 AM
Project Title

Pipe Repairs in Underground Vault, Elm Terrace 667-1

Physical Address View project details and contacts
City, State (County) Greenfield, MA 01301   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $44,450
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of the project includes but is not limited to; Remove and replace existing cracked piping and isolation valves in the vault. Provide new backwater valve assembly in the vault. Replace existing meter if necessary. Evaluate code compliance and provide all necessary missing components of the cold water supply service

Details

Division 01 - General Requirements.
Division 22 - Plumbing.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Base Courses, Asphaltic Base Courses, Bituminous-Stabilized Base Courses.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents