Similar Projects
Raytheon Tech Global Headquarters
New Construction
Conception
Arlington, VA

Mixed-Use Development Project
New Construction, Demolition
Conception
$7,000,000 est. value
Virginia Beach, VA 23453

101 12th Street - Crystal Gateway
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Arlington, VA

Joyce Motors Mixed-use Redevelopment / 10th and Irving
New Construction, Infrastructure - 185,000 SF
Design
$25,000,000 CJ est. value
Arlington, VA 22201

Unsignalized Intersections
Infrastructure
Bidding
$689,000 CJ est. value
Arlington, VA 22201

Traffic Engineering and Operation Interior Renovation
Addition, New Construction, Renovation, Infrastructure
Bidding
$450,000 CJ est. value
Arlington, VA 22206

Spec Suite 300 - Clarendon Center South
Renovation - 2,319 SF
Post-Bid
Arlington, VA 22201

Spec Suite 330 - Clarendon Center South
Renovation
Post-Bid
Arlington, VA 22201

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

WETA Expansion
Addition - 17,000 SF
Construction
Arlington, VA 22206

Liberty Center Corridor Renovation
Renovation
Construction
$453,673 est. value
Arlington, VA 22203

Crystal Plaza 5
New Construction
Pending Verification
$160,000,000 CJ est. value
Arlington, VA 22202

North Irviing Street Mixed Use and Bank
New Construction
Pending Verification
Arlington, VA 22201

Arlington Boathouse - Arlington County
New Construction, Infrastructure
Conception
$12,385,000 CJ est. value
Arlington, VA 22209

Last Updated 12/06/2022 07:09 PM
Project Title

Realize Rosslyn Plaza - Phase 5

Physical Address View project details and contacts
City, State (County) Arlington, VA 22205   (Arlington County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $133,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 5 includes new construction of an office building with accommodating parking. As of October 8 2020, entitlements have been approved but nothing further has progressed for this project. Information regarding a developer and general contractor has not been confirmed. A timeline for construction is unknown.

Details

625,261 SF, 522.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents