Similar Projects
FY21 USACE Galveston District, FY21 Houston Ship Channel Oyster Mitigation, Harris County, Texas
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Houston, TX

Storm Sewer, Sanitary Sewer and Water Lines to Serve Massey Oaks Section 1
Infrastructure
Bidding
TX

Avellino Detention Pond
Infrastructure
Bidding
Manvel, TX

Storm Sewer, Sanitary Sewer, Water Line Mitigation Basin, and Storm Sewer Pump Station to Serve Mustang Ridge Sections One and Two
Post-Bid
TX

Sierra Vista West Section 6 - Water, Sanitary, and Drainage
Post-Bid
TX

Water, Sanitary Sewer, and Drainage Facilities to Serve Bluewater Lakes Section 6
Results
TX

Freeport Harbor Levee Stabilization Wall Project
Results
Freeport, TX 77541

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Meridiana, Section Fifty
Infrastructure
Bidding
TX

High Density Polypropylene Storm Sewer Pipe Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Holiday Lakes Flood and Drainage Improvements
Results
$671,062 est. value
Angleton, TX 77515

Chocolate Bayou Detention Basin T Phase 2, Detention Basin V and Earthwork to Serve Meridiana
Infrastructure
Bidding
Houston, TX

Reinforced Concrete Storm Sewer Box Culverts Annual Contract
Term Contract
Post-Bid
Pearland, TX 77581

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Meridiana, Section Forty Five
Results
TX

Water, Sanitary Sewer, Drainage Facilities to Serve Caldwell Ranch Section 7
Infrastructure
Bidding

Mustang Bayou Bank Repair at National Oaks Park
Post-Bid
Alvin, TX 77511

Last Updated 08/11/2021 08:33 AM
Project Title

West Fork of Chocolate Bayou Detention Basin O Phase 2, Detention Basin P and Earthwork to serve Meridiana

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include approximately 130 acres of site preparation, 5 acres of heavy clearing, 342,000 CY of pond excavation, 675 LF of 24”- 60” RCP and 540 LF of 9'(W) x6'(H) RCB storm sewer.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents