Similar Projects
Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Ramp Reconstruction, Resurfacing, Drainage, Signal and ADA Improvements - TH 36
Alteration
Conception
$1,800,000 est. value
Roseville, MN 55112

Silver Lake Road and I694 Intersection Improvement Project
Infrastructure
Design
$300,000 CJ est. value
New Brighton, MN 55112

(MWWTP) Services Buildings and Site Improvements
Renovation, Infrastructure
Bidding
$35,000,000 CJ est. value
Saint Paul, MN 55101

Pool 2 Wing Dam Notching
Infrastructure
Bidding
$500,000 CJ est. value
Saint Paul, MN 55101

SPPS Jie Ming BP #4 Coiling Doors and Grilles
Renovation
Sub-Bidding
$100,000 CJ est. value
Saint Paul, MN 55116

SPPS Jie Ming BP 4 Carpet and Resilient Flooring
Renovation
Sub-Bidding
$200,000 CJ est. value
Saint Paul, MN 55116

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

Trash Enclosures Replacement and Site Improvement
New Construction, Infrastructure, Alteration
Post-Bid
Saint Paul, MN 55130

DNR4 Sandstone FY21 Site Prep
Infrastructure
Results
$50,000 est. value
Saint Paul, MN

Underground Utility, Excavation and Construction Services
Infrastructure
Results
MN

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 WS 03A - Concrete
Renovation
Construction
$700,000 CJ est. value
Saint Paul, MN 55116

Lexington Avenue Commercial Buildings
Demolition, New Construction, Infrastructure - 24,780 SF
Pending Verification
$8,000,000 CJ est. value
Arden Hills, MN 55126

Polar Industrial Park
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
White Bear Lake, MN 55127

Last Updated 08/11/2022 04:33 PM
Project Title

Jie Ming Immersion Academy Addition and Renovation - Part 2, Bid Package #3

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55116   (Ramsey County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Site Development, Vocational School
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction began on July 21, 2022 and is expected to be completed in 2024. Final day to submit contractor questions (via Electronically), May 26, 2022 @ 2:00 P.M. Jie Ming Immersion Academy Addition and Renovation - Part 2, Bid Package #3 Bid # A22-2284-JA, WS 02A - Selective Demolition & Temporary Conditions Bid # A22-2287-JA, WS 21A - Fire Protection Bid # A22-2379-JA, WS 23B - Plumbing & HVAC Temporary Conditions Bid # A22-2380-JA, WS 26B - Electrical Temporary Conditions Bid # A22-2288-JA, WS 31A - Earthwork, Utilities, Building Demolition The Jie Ming Mandarin Immersion Addition and Renovation - Part 2 project includes the addition ofapproximately 20,000 SF ofnew construction, including a new cafeteria and kitchen and five new classrooms. A portion ofthe addition is designed to serve as a severe weather storm shelter. The project also includes replacing one boiler in the original building mechanical room and the full HVAC system in the 1950s era portion ofthe building. One set ofinclusive restrooms will be added, and the existing gym floor will be replaced. Traffic areas including for buses, cars, and service vehicles will be reconfigured

Details

20,000 SF.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents