Similar Projects
Signal Improvements Multi-Term
Term Contract
Bidding
Brighton, CO

Traffic Mesoscopic/Micro
Post-Bid
Denver, CO 80204

Traffic Signal Pole Inspections
Post-Bid
Commerce City, CO 80022

Jamaica Street and Meridian Boulevard Intersection Improvements
Results
Less than $3,581,615 est. value
Castle Rock, CO 80104

Signals replacement
Results
Less than $1,000,000 est. value

Traffic Signal and Luminaire Repair
Term Contract
Post-Bid
Brighton, CO 80601

Traffic Signal Directional Boring
Results
Less than $50,000 est. value
Greeley, CO

Traffic Signals Upgrade
Post-Bid
$983,000 to $1,201,000 est. value
Denver, CO 80202

Mill Levy 23 - Yosemite Corridor and Mill Levy 14 - Downing at Evans and Yale - Traffic Signal Upgrades
Results
$2,200,000 to $2,700,000 est. value
Denver, CO 80202

Adaptive Traffic Signal Sys
Post-Bid
Castle Rock, CO 80104

Chambers Road and Innovation Way Traffic Signal
Results
CO

Work Zone Traffic Control Device Rental and Service
Post-Bid
Arvada, CO

Traffic Signal Replacement
Results
Less than $1,000,000 est. value
CO

Traffic Control Services
Post-Bid
CO

Arvada Traffic Signal Interconnect
Results
$300,000 to $320,000 est. value
Arvada, CO

Reported 03/01/2022 12:00 AM
Project Title

Havana Street Transit Improvements

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $665,000 to $700,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work performed shall include, but is not limited, to: Queue jumps, bypass lanes for transit, bus bulb outs with amenity upgrades, transit signal priority at signalized intersections, and additional amenity upgrades at existing bus stops; Project is designed and will be reconstructed to City Standard within the Roadway Design and Construction Manual (2016), Anticipated Construction Period: April 1, 2022 to December 31, 2022. A warranty period will not be applicable to this project.

Details

Division 10 - Specialties, Protective Covers, Transportation Stop Shelters.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents